Presentation is loading. Please wait.

Presentation is loading. Please wait.

December 15, 2004M. Woodley, Beam Delivery Group1 ILC Beam Delivery System: Straw-Man Layout.

Similar presentations


Presentation on theme: "December 15, 2004M. Woodley, Beam Delivery Group1 ILC Beam Delivery System: Straw-Man Layout."— Presentation transcript:

1 December 15, 2004M. Woodley, ILC@SLAC Beam Delivery Group1 ILC Beam Delivery System: Straw-Man Layout

2 December 15, 2004M. Woodley, ILC@SLAC Beam Delivery Group2 Yuri’s ILC 20 mrad dump lines NLC BSY dump lines 11 mrad Yuri-style Big Bends 55 m “stretch” 200 m drifts Andrei’s 20 mrad ILC FF (x 4) Symmetric “Push-Pull” Layout IR1 20 mrad IR2 2 mrad

3 December 15, 2004M. Woodley, ILC@SLAC Beam Delivery Group3 bending in energy collimation system reduced for zero net coll/FF bend; reduces max η (was 0.213 m) Andrei’s “ff126” modifications applied to latest NLC coll/FF system Includes: spoilers absorbers muon shields photon masks PCs stoppers instrumentation feedback

4 December 15, 2004M. Woodley, ILC@SLAC Beam Delivery Group4 Yuri-style (NLC) 11 mrad Big Bend ISR:

5 December 15, 2004M. Woodley, ILC@SLAC Beam Delivery Group5 Plans add energy spectrometers (~55 m) add polarimeters (~50 m) “Push-Pull” or longitudinal IR separation? 2 mrad coll/FF/extraction design incorporate Brett Parker’s design for fast extraction / tune-up into NLC dump line adjustments for PPS (people in one IR with beam in the other IR)

6 December 15, 2004M. Woodley, ILC@SLAC Beam Delivery Group6


Download ppt "December 15, 2004M. Woodley, Beam Delivery Group1 ILC Beam Delivery System: Straw-Man Layout."

Similar presentations


Ads by Google