Presentation is loading. Please wait.

Presentation is loading. Please wait.

FIGURE 15-1 Simplified cross section developed from site and subsurface characterization.

Similar presentations


Presentation on theme: "FIGURE 15-1 Simplified cross section developed from site and subsurface characterization."— Presentation transcript:

1 FIGURE 15-1 Simplified cross section developed from site and subsurface characterization.

2 FIGURE 15-2 Early geophysicist (or modern diviner).

3 FIGURE 15-3 Interpretation of a historic air photo of a landfill.

4 FIGURE 15-4 Workers in Level C protective equipment sampling a tank truck.

5 FIGURE 15-5 Schematic of seismic survey.

6 FIGURE 15-6 Schematic of resistivity survey.

7 FIGURE 15-7 Terrain conductivity contours.

8 FIGURE 15-8 Ground-penetrating radar.

9 FIGURE 15-9 Magnetometer survey results.

10 FIGURE 15-10 Continuous flight augers.

11 FIGURE 15-11 Solid- and hollow-stem augers.

12 FIGURE 15-12 Mud rotary drilling.

13 FIGURE 15-13 Standard penetration test.

14 FIGURE 15-15 Vane shear testing.

15 FIGURE 15-16 Correction to vane shear test results.

16 FIGURE 15-17 Dilatometer testing.

17 FIGURE 15-18 Water level measurement.

18 FIGURE 15-20 Thin-wall samplers.

19 FIGURE 15-20 Thin-wall samplers.

20 FIGURE 15-21 Rock coring equipment.

21 FIGURE 15-22 Typical monitoring well.

22 FIGURE 15-23 Perched water table.

23 FIGURE 15-24 Piezometer cluster in unconfined/confined aquifer system.

24 FIGURE 15-25 Piezometers in confined aquifer.

25 FIGURE 15-26 Multiple and nested wells.

26 FIGURE 15-27 Monitoring rock formations.

27 FIGURE 15-28 Multilayer aquifer system.

28 FIGURE 15-29 Drilling through contaminated aquifer.

29 FIGURE 15-30 Principle of soil gas surveys.

30 FIGURE 15-31 Mobile laboratory used for soil analysis.

31 FIGURE 15-32 Interior of mobile laboratory.

32 FIGURE 15-33 Site map.

33 FIGURE 15-34 GIS representation of contaminated soil (Scenario II).

34 FIGURE 15-35 GIS representation of contaminated soil (Scenario V).

35 FIGURE 15-36 Contour map.

36 FIGURE 15-37 Three-dimensional representation of site topography.

37 FIGURE 15-38 Typical boring log.

38 FIGURE 15-39 Geologic profile.

39 FIGURE 15-40 Structural contour.

40 FIGURE 15-41 Isopac map.

41 November 8, 2000 13:51 lag93656_ch15 Sheet number 64 Page number 975 black 975 SECTION15-9 Case Study. FIGURE 15-43 Groundwater contours.


Download ppt "FIGURE 15-1 Simplified cross section developed from site and subsurface characterization."

Similar presentations


Ads by Google