Download presentation
Presentation is loading. Please wait.
2
Created by Michael
3
ABOUT THE SAS A dream for decades, the SAS is currently being built to relieve overcrowding on the Lexington Ave. Line. The SAS project will include a two-track line along second avenue from 125th street to the financial district in lower Manhattan. The line will be built in four phases and contain two subway services: an extension of the existing Q subway line and the new T line.
4
SAS PHASES Phase 1 will be an extension of the Q across 63 rd street and north along second avenue to the upper east side at 96 th street. Phase 2 will be another extension of the Q to 125 th street from 96 th street. Phase 3 will be from 63 rd street to Houston street which will introduce the new T line. Phase 4 will be from Houston street to Hanover square which completes the line.
5
PAST OF THE SAS http://www.youtube.com/watch?v=ltwp-zU-CnA
6
FUTURE OF THE SAS
7
BIBLIOGRAPHY
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.