Final Presentation Minerva Engineering
2
Introduction John Kats- Project Manager Ryan Schipper- Project Editor Matt Lash- Project Engineer/Client Contact Peter Flynn- Project Engineer Stephen Rowe- Project Engineer PARAGON Josh Reed- Client Contact
3
Overview Overview Preliminary Investigation Layout Options Final Work Summary
4
Preliminary Feasibility Study Site Visit Zoning Market investigation Environmental Site assessment
5
Codes and Regulations Greenfield, Indiana Code of Ordinances Hancock County, Indiana Code of Ordinances Hancock County, Indiana Stormwater Technical Standards Manual INDOT & AASHTO International Building Code American Standard of Testing Methods (ASTM)
6
Geotechnical Investigation Field Work and Testing Located Utilities Determined sampling points Bag Samples Tube Samples Wildcat Dynamic Cone Penetration Tests
7
Geotechnical Investigation Soil Sampling Locations
8
LEED Analysis Researched requirements Evaluated point criteria Determined feasibility
9
Decision Matrix Criteria used for rating layout design options: Estimated Cost Expected Income Amenities A systematic approach for determining lot layout
10
Decision Matrix Explanation of Estimated Cost:
11
Decision Matrix Explanation of Estimated Income:
12
Decision Matrix Explanation of Amenities:
13
Decision Matrix Assessment of Layout Options:
14
10 Estate Lots 41 Custom Home Lots 31 Zero Maintenance Lots Site Layout Option 3
15
Roadway and Pavement Subdivision Control Ordinances 34 feet wide from gutter to gutter 4 foot sidewalks on either side
16
Rain Garden Bioretention area Designed to not be a wetland List of acceptable plant life in Central Indiana Incorporated into Stormwater System
17
Erosion & Sediment Control Phase I Plan
18
Erosion & Sediment Control Phase II Plan
19
Erosion & Sediment Control Drop Inlet Protection Outlet Protection Curb Inlet Protection
20
Stormwater Management Design of pipesDesign of pipes Retention PondsRetention Ponds Rain GardenRain Garden LIDLID
21
Wastewater Management Tie-in to Greenfield Wastewater Management Placement of Pipes
22
Grading Plan Before After
23
Detail of Phase I Substantial Cut Cut can be used for the burm
24
Construction Cost Estimate Estimation for roads, sidewalks, curb and gutter, excavation, utility hook-ups, erosion and sediment control and landscaping Unit pricing was found using the RS Means Manual
25
Cost Summary
26
Questions?