Download presentation
1
P&ID Safety Case Study Texas City Refinery Disaster
Narrated by Kevin Lin and Eric Gauthier
2
Plant Background 460,000 barrels/day 11 million gallons Texas City
1800 employees 1200 acres
3
Operation Unit Pg A-11
4
Operation Unit Raffinate Splitter
Pg A-11
5
Operation Unit Relief Valves Raffinate Splitter
Pg A-11
6
Operation Unit Stack Relief Valves Raffinate Splitter Blowdown Drum
Pg A-11
7
Disaster Strikes Isomerization Unit Overflow of Distillation Tower
Overpressurization Flooding with hydrocarbons 15 workers killed 180 injured
8
What Went Wrong? Stack Relief Valves Raffinate Splitter Blowdown Drum
Pg A-11
9
What Went Wrong? Stack Relief Valves Raffinate Splitter Blowdown Drum
Pg A-11
10
What Went Wrong? Stack Relief Valves Raffinate Splitter Blowdown Drum
Pg A-11
11
5x9000 gallon tanker trucks What Went Wrong? Stack Relief Valves
Raffinate Splitter Blowdown Drum Pg A-11
12
What Went Wrong? Stack Relief Valves Raffinate Splitter Blowdown Drum
Pg A-11
13
pg 4
15
Blog.kir.com
17
Prevention Measures—Engineering
Improve Process Control Automated emergency shutdown system Location of Relief Valve Top of tower for greater control of vaporization Blowdown/Stack Flare Relief System
18
Prevention Measures—Human Control
Positive Work Enviroment Management Enforcement Of: Process safety Operations performance Systematic risk reduction Training
19
Remember, YOU are responsible for maintaining a safe workplace!!
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.