02/24/09 Green Data Center project Alan Crosswell
2
02/24/09 2 Agenda The Data Center Status Quo Future State Goals Our NYSERDA Advanced Concepts Datacenter proposal
3
02/24/09 3 The Data Center Status Quo Architectural –Built in 1963, updated somewhat in the 1980's. –5000 sf (465 m^2) raised floor machine room space. –1750 sf (163 m^2) raised floor space, now offices. –12” raised floor –Adequate support spaces nearby Staff Staging Storage Mechanical & fire suppression
4
02/24/09 4 The Data Center Status Quo (cont'd) Electrical –Supply: 3-phase 208V from automatic transfer switch. –Distribution: 208V to wall-mounted panels; 120V to most servers. –No central UPS; lots of rack-mounted units. –Generator: 1750 kW shared with other users. At capacity. –No metering. (Spot readings every decade or so:-) –IT demand load tripled from 2001-2008 2001: 107 kVA 2008: 335 kVA
5
02/24/09 5 The Data Center Status Quo (cont'd) Mechanical –On floor CRAC units served by campus chilled water. –Also served by backup glycol dry coolers. –Supplements a central overhead chilled air system. –Heat load is shared between the overhead and CRAC. –No hot/cold aisles –Rows are in various orientations –Due to tripling of demand load, the backup (generator-powered) CRAC units lack sufficient capacity.
6
02/24/09 6 The Data Center Status Quo (cont'd) IT systems –A mix of mostly administrative (non- research) systems. –Most servers dual-corded 120V power input. –Many ancient servers. –Due to lack of room UPS, each rack has UPSes taking up 30-40% of the space. –Lots of spaghetti in the racks and under the floor.
7
02/24/09 7 The Data Center Status Quo (cont'd) Other data centers –Many small school, departmental & research server rooms all over the place. –Most lack electrical or HVAC backup. –Many could be better used as academic space (labs, offices, classrooms). –Growth in research HPC putting increasing pressure on these server rooms. –Lots of wasted money building new server rooms for HPC clusters that are part of faculty startup packages, etc.
8
02/24/09 8 Future State Goals – Next 5 years Begin phased upgrades of the Data Center to Improve power and space efficiency. Overall cost ~ $20M. Consolidate and replace pizza box servers with blades (& virtualization). Consolidate and simplify storage systems. Accommodate growing demand for HPC research clusters Accommodate server needs of new Interdisciplinary Science Building. Develop internal cloud services. Explore external cloud services.
9
02/24/09 9 Future State Goals – Next 10 years Build a new data center of 10,000-15,000 sf Consolidate many small server rooms. Significant use of green-energy cloud computing resources. From www.jiminypeak.com
10
02/24/09 10 Our NYSERDA Proposal New York State Energy Research & Development Authority Program Opportunity Notice 1206 ~$1M ($447K from NYSERDA awarded pending contract) Improve space & power efficiency of primarily administrative servers. Contribute to Columbia's PlaNYC carbon footprint reduction goal. Make room for shared research computing in the existing data center. Measure and test vendor claims of energy efficiency improvements.
11
02/24/09 11 Our NYSERDA Proposal – Specific Tasks Identify 30 old servers to replace. Instrument server power consumption and data center heat load. “Real time” with SNMP. Establish PUE profile (use DoE DC Pro survey tool) Implement 9 racks of high-density cooling (in-row/rack). Implement proper UPS and high-voltage distribution. Compare old & new research clusters' power consumption for the same workload. Implement advanced server power management and measure improvements. Review with internal, external and research faculty advisory groups. Communicate results.