Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 25 August 2003 Sam Burke UCSB HEP Group
2
Slide 2UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Progress 4Hybrid Test System moved into Clean Room Cold Box software integrated with ARC software Interface testing carried out on LVDS/CMOS Converter with unit in NIM Crate
3
Slide 3UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Cold Box in Clean Room
4
Slide 4UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE 3 ARC Test Systems
5
Slide 5UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE LVDS / CMOS Testing
6
Slide 6UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Future Plans Test Pitch Adapter Pulser Function Test 4 Hybrids with Pitch Adapters