1
1 Beam test at DESY Date: 01/12 – 19/12 Place: DESY, Testbeam area 24 Time schedule and more information available: http://desyntwww.desy.de/~testbeam
2
2 Test beam area 24 movable table fixture for scintillators magnet (not used) Good conditions in test beam area - plenty of space - no problem with usage of gas -comfortable counting room
3
3 Detectors and services 4 Warsaw modules are shipped from Nikhef to Heidelberg this week. Mechanical support and gas system can be provided by Heidelberg. Most effort still necessary for electronics (see next slides). available manpower is limited!
4
4 Necessary Equipment (Hardware) 4 front end boxes missing 1 distribution box (including I²C) missing TTC-system : TTCvi + TTCvx available 1 OrxCard + 12 LVDS Adapter available 2 Stratix Boards + Adapter available
5
5 Necessary Equipment (Hardware) Power supplies : missing ± 5V / 50A 2.5V / 5A 3.3V /10A 3 PCs available 2 Scintillator + Nim crate available Cooling missing (Peltier element + CPU cooler )
6
6 Necessary Equipment (Software) Stratix board code for 6 links available in Dortmund?? Readout software for the available Stratix Board via PCI-Bus DAQ monitoring missing I²C control available TTC control available
7
7 Many components available, but system test is mandatory!