Stefan Moeller XES FAC Review – April 16, 2006 X-Ray Endstation Systems (XES) Status Stefan Moeller.

Similar presentations


Presentation on theme: "Stefan Moeller XES FAC Review – April 16, 2006 X-Ray Endstation Systems (XES) Status Stefan Moeller."— Presentation transcript:

1 Stefan Moeller XES Statussmoeller@slac.stanford.edu FAC Review – April 16, 2006 X-Ray Endstation Systems (XES) Status Stefan Moeller

2 XES Statussmoeller@slac.stanford.edu FAC Review – April 16, 2006 Outline Recent Developments Status Milestones Plan for rest of FY07 Summary

3 Stefan Moeller XES Statussmoeller@slac.stanford.edu FAC Review – April 16, 2006 Recent Developments: Effects of new LCLS baseline schedule Provide a basic AMO instrument for 4a (3/09) Add enhanced functionality for 4b (3/10) Provide controls infrastructure to enable operation of NEH for 4a Phase controls capabilities e.g. data storage, high level applications Delay systems/procurements related to Tunnel and Far Hall PPS, Controls XES Laser system delayed Cornell Detector schedule not affected

4 Stefan Moeller XES Statussmoeller@slac.stanford.edu FAC Review – April 16, 2006 LCLS XES 1.6/2.6

5 Stefan Moeller XES Statussmoeller@slac.stanford.edu FAC Review – April 16, 2006 Status: AMO Instrument

6 Stefan Moeller XES Statussmoeller@slac.stanford.edu FAC Review – April 16, 2006 AMO Instrument Scientific goals defined Physics Requirements finalized (PRD 12/06) Instrument components are identified (SCR 12/06) Working towards Preliminary Design Review (5/07) AMO controls requirements defined (CDR 4/07) ESDs of components in 5/07 New baseline plan was reviewed with AMO science group

7 Stefan Moeller XES Statussmoeller@slac.stanford.edu FAC Review – April 16, 2006 Hutch 2 Layout

8 Stefan Moeller XES Statussmoeller@slac.stanford.edu FAC Review – April 16, 2006 AMO Instrumentation Overview Differential pumping Focusing optics High field physics chamber Diagnostics Chamber Molecule/Cluster Imaging Apparatus High Field Laser Controls

9 Stefan Moeller XES Statussmoeller@slac.stanford.edu FAC Review – April 16, 2006 AMO Plan PDR in 5/07 FDR 10/07 Start procurements 6/07 Receive 3/08 Installation 5/08 Basic experimental capabilities ready for first light (8/08) Full AMO apparatus complete 3/10 AMO Controls on same schedule

10 Stefan Moeller XES Statussmoeller@slac.stanford.edu FAC Review – April 16, 2006 Cornell 2D Detector

11 Stefan Moeller XES Statussmoeller@slac.stanford.edu FAC Review – April 16, 2006 Cornell 2D Detector Over half way through the project (Start 1/05) LDAC Review #4 for CY06 (Feb. 05-06, 2007) Good review, on schedule Next review in fall 07 (mid term review) Submitted full-lot 190x190 pixel ASIC and diode Receive full lot prototype in 09/07 Design full scale read out (FPGA), data transfer and storage Designs on tiling and packaging are being developed

12 Stefan Moeller XES Statussmoeller@slac.stanford.edu FAC Review – April 16, 2006 Cornell 2D Detector

13 Stefan Moeller XES Statussmoeller@slac.stanford.edu FAC Review – April 16, 2006 Controls 2x per week meetings of the XES/LUSI Controls group CDR 4/07 AMO experimental controls AMO control hard ware components defined Data acquisition and detector controls SLAC in house CE module solution Data storage SCCS BaBar model see talk by B. Sass

14 Stefan Moeller XES Statussmoeller@slac.stanford.edu FAC Review – April 16, 2006 XES/LUSI Architecture

15 Stefan Moeller XES Statussmoeller@slac.stanford.edu FAC Review – April 16, 2006 Other XES activities Biweekly meeting of the LUSI-LCLS interface working group Rebaseline of XES schedule to be finalized soon PPS stopper design is progressing Safety review process has started with SOC

16 Stefan Moeller XES Statussmoeller@slac.stanford.edu FAC Review – April 16, 2006 XES L3 Milestones Level 3 FY07 LDAC Mid-Project Review 2D Detector 4/07 CT: Network Final Design Review 5/07 CT: AMO Exp. Control Final Design Review 9/07 FY08 Ready for Installation in NEH 10/07 2D Detector Production Start 12/07 XES Laser Final Design Review 2/08 Electron Dump Stopper certified 2/08 Start XES Commissioning 3/08 Award XES Laser System 4/08 CT: AMO Exp. Control Complete 7/08 AMO Mech./Vacuum Installation complete 9/08 FY09 CT: Complete Network Installation 10/08 XES Laser Operating in NEH 12/08 Complete Acceptance Tests of Detectors 1/09

17 Stefan Moeller XES Statussmoeller@slac.stanford.edu FAC Review – April 16, 2006 6 Month Look Ahead XES Management: Finalize Rebaseline Schedule XES Controls: (LCLS Controls) Start Preliminary Design phase XES Laser: (LCLS Lasers) Delayed: Specify Laser, Diagnostics and Transport AMOS PDR 5/07 FDR 11/07 Start procurements 6/07 PPS Stoppers and Shielding: (delayed) PRD PPS in signing stage ESD and Design of Photon stoppers Electron beam dump stoppers Cornell Detector: Bump bonding ASIC to diode Delivery of full lot proto to SLAC (9/07) Design read out electronic and data handling

18 Stefan Moeller XES Statussmoeller@slac.stanford.edu FAC Review – April 16, 2006 Summary XES is responding to new LCLS baseline plan Controls design for XES has started, tight schedule On track for delivering a basic AMO station for experiments for first light 2D Detector program at Cornell is on schedule Started Safety Review process for x-ray areas


Download ppt "Stefan Moeller XES FAC Review – April 16, 2006 X-Ray Endstation Systems (XES) Status Stefan Moeller."

Similar presentations


Ads by Google