COMP6703 : eScience Project III ArtServe on Rubens Emy Elyanee binti Mustapha u4160964@anu.edu.au Supervisor: Peter Stradzins Client: Professor Michael Greenhalgh
2
Background It is established in January 1994 by Professor Michael Greenhalgh, who is the client for this project A website containing mainly visual images (photos from around the world) ArtServe has attracted many users up to 201153 in July 2005
3
Background - Continue Problems are: lack of proper database, lack of proper search tool within the website, poor usability Previous semester, an eScience student has chosen this project and solves the problems For this semester, I will be installing and implementing Nhi Ha’s codes on the real machine and do a proper software testing to ensure its correctness and compatibility. As well as a couple of additional functions.
4
Requirements Installing, implementation and testing of the prototype Guest book for visitors to interact with Admin Export images and convert to appropriate presentation style
5
Timetable WeekDateDescriptionDeliverable 118 – 23 July- Choosing project title - Analysis of previous student’s report - Meeting with client and supervisor 225 – 29 July- Meeting with client - Analysis of previous student’s codes - Analysis of the project requirement - Analysis of current web site 31 - 5 Aug- Draft report of project requirement - First project presentation - Presentation slides - Draft report 48 – 12 Aug- Modelling and learning of chosen techniques phase - Installing prototype on the real machine - Preparation for the testing of the prototype - Prototype installed and working - Test Plan 515 – 19 Aug- Modelling phase completed - Testing of the prototype on the real machine - System Analysis Diagrams 622 – 26 Aug- Beginning of implementation phase - Testing of the prototype on the real machine complete - Test result - Small release 729 Aug – 2 Sept- Implementation- Small release
6
Timetable - continue 85 – 9 Sept- Implementation- Small release 912 – 16 Sept- Mid-project result- Prototype for guest book - Draft report 1019 – 23 Sept- Comments by supervisors 1126 – 30 Sept- Implementation of comments - Usability Test conducted - Usability test result 124 – 7 Oct- Debugging - Usability test result evaluation and GUI adjustment - Usability report 1310 – 14 Oct- Documentation - Implementation continue - Small release 1417 – 21 Oct- Implementation completed- All system components 1524 – 28 Oct- Documentation - User Guide / System documentation - Final testing - User Guide documentation - Final test result 1631 Oct – 4 Nov- Project Presentation- Presentation Slides 177 – 11 Nov- Documentation 1814 – 18 Nov- Report Completed- Final version of report