CMS week – December 8-12, 20031 TOB sensor quality Regina Demina University of Rochester
2
CMS week – December 8-12, 20032 OutlineOutline Stability of IV Leaky strips
3
CMS week – December 8-12, 20033 IV vs time Current at 400V FNAL remeasurement vs DB 3/61 failed on retest 0/65 failed on retest 17/250 failed on retest
4
CMS week – December 8-12, 20034 IVCV no vacuum effect so far Sensor left on chuck for several hours between measurements 1 and 2. Just needed rest?
5
CMS week – December 8-12, 20035 I leak and I strip
6
CMS week – December 8-12, 20036 SummarySummary Some instability of I leak vs time is observed 2002 sensors seem to be the worst, fraction of originally passed sensors failing retests –6.8% 2003 sensors look better (but maybe not enough time) I leak increase seems to be related to leaky strip development