Preparing for Quiz 1 Review notes, assignments Take practice quiz Read Tips on Taking On-line Exams Get a good night's rest Quiz 1 coverage: up to and.

Similar presentations


Presentation on theme: "Preparing for Quiz 1 Review notes, assignments Take practice quiz Read Tips on Taking On-line Exams Get a good night's rest Quiz 1 coverage: up to and."— Presentation transcript:

1 Preparing for Quiz 1 Review notes, assignments Take practice quiz Read Tips on Taking On-line Exams Get a good night's rest Quiz 1 coverage: up to and including wrap-up of forecasting

2 Quiz Schedule Lab section Enter lab Quiz begins Quiz ends 8 am7:558:008:40 9 am8:559:009:40 11 am10:5511:0011:40 12 pm11:5512:0012:40 All lab sections treated the same Transition periods are crucial

3 When you come to the lab Find assigned computer, go to course web You may copy materials to the desktop before the quiz starts –From USB key, CD, or email You may not use a USB key, CD, email, etc. during the quiz Listen carefully to instructions Have OneCard ready.

4 When the quiz begins Take a deep breath! If the first question looks too simple, it is

5 During the quiz Keep breathing! Save often Submit early, submit often Do not worry about decimals, formatting Later questions may depend on earlier ones. Feel free to make up answers. If your computer freezes, raise your hand right away. You will be given extra time for computer problems beyond your control.

6 Near the end 5-minute warning Stop, save, submit Check that responses appear on confirmation web page If you have time, do more work Don’t risk late penalty ! When done: delete files from desktop

7 Things to watch for… Practice finding good solutions without Solver Error messages in Solver: –“Error in set target cell not met” –If you see a message you do not recognize, raise your hand immediately and we will help with the tech issue –Do not try to fix this for 20 min and then tell us since we will not be able to give you an extra 20 min on the quiz

8 Reminders Quiz Review Session, Thu 5:30 – 6:30 pm, BUS B-24+28 –Optional –Q&A session, no new material

9 MGTSC 352 Lecture 9: Aggregate Planning Overview of Planning: Matching Demand and Capacity Case 2: Mountain Wear Leduc Control Example

10 Overview of Planning (pg. 46) Short-range Job assignment Machine loading Job sequencing Lot sizing Order quantities 02 mo. Intermediate Aggregate levels of: Workforce Inventory Output Subcontracting Backorders 18 mo. Long-range Product design Location Layout Capacity Process 5 yrs.?

11 Sequence of Planning (pg. 47) Corporate Strategy External Conditions Demand Forecasts Aggregate Plan Master Production Schedule MRP = Materials Requirements Planning Weekly Workforce + Customer Schedule Daily Schedule ManufacturingService

12 Matching Demand and Capacity Influencing demand ? Changing capacity ?

13 Matching Demand and Capacity (pg.48) Influencing demand Pricing Promotion Back orders New demand Changing capacity Hiring/firing Overtime/slack time Part-time workers Subcontracting Inventories

14 Case 2: Mountain Wear (pg. 96)

15 Case 2: Mountain Wear Decide … how much to produce how much inventory to carry how many people to hire or lay off how much overtime to use … in order to satisfy demand and minimize cost AGGREGATE PLANNING Let’s look at the first aggregate plan in the case … For next week: read case (pg. 96), fill in the blanks on pages 49-50 in course pack

16 Leduc Control (pgs.52-53) The mysteries of solver unraveled … –… slowly How many units of each product to produce for the next period? –Simpler than Mountain Wear

17 Leduc Control Products: AS 1012 and HL 734 Production planning meeting: –Howie Jones (CEO) –Homer Simpson (Production) –Andy Marshall (Marketing) –Tania Tinoco (Accountant) –Kim Becalm (you)

18 Homer ResourceAS 1012HL 734Available PSoC11200 Assembly9 hrs.6 hrs.1,566 Programming12 hrs.16 hrs.2,880

19 Andy Can sell all we produce No room to raise prices

20 Tania ResourceAS 1012HL 734Unit Cost PSoC11$720 Assembly96$20 Programming1216$20 Var. cost / unit$1,140$1,160

21 More From Tania AS 1012HL 734 Selling price$1,490$1,460 Var. cost($1,140)($1,160) Net margin$350$300 Less: allocated fixed costs($310) Profit / unit$40($10) Tania’s conclusion: produce 200 AS 1012 and 0 HL 734 Do you agree?

22 Leduc Control Example (pg. 60) A linear problem –The “set cell” is linear function of changing cells –All constraints are linear functions of changing cells A linear function is one that involves –addition (or subtraction) –multiplication of a constant with a changing cell –no other operations –mathematically ax + by  linear function of two variables (x and y)

23 Linear vs. nonlinear If possible, use a linear formulation –Solver will work more reliably Convert Y/X ≤ 0.5 to Y ≤ 0.5X Quick-and-dirty approach: –Click “Assume Linear Model” and solve –If solver complains, unclick, try again

24 Leduc Control Example – Alternative Representations (pg. 61) Spreadsheet formulation (what we did in class) In English –Maximize net contribution –By varying the production levels of the two products –Subject to constraints: Use no more than 200 PSoCs Use no more than 1566 hours of assembly time Use no more than 2880 hours of programming (Do not produce negative units)

25 Algebraic Formulation

26 Matrix Formulation

27 Formulation in AMPL (= Algebraic Mathematical Programming Language) param NUM_RESOURCES; param NUM_PRODUCTS; set RESOURCES:=1..NUM_RESOURCES; set PRODUCTS:=1..NUM_PRODUCTS; param c {PRODUCTS} >= 0; # net margin per unit param A {RESOURCES, PRODUCTS} >= 0; # per-unit resource requirements param b {RESOURCS} >= 0; # resource availability var x {PRODUCTS} >=0; # number to make of each product # Objective: # Maximize the total net margin maximize total_net_margin: sum {i in PRODUCTS} c[i]*x[i]; # Constraints: # resource availability constraints subject to res_constr {j in RESOURCS}: sum{i in PRODUCTS} A[i,j] x[i] <= b[j];

28 Which Formulation is Best? Depends on what you want to do: –Understand the problem –Solve the problem Small problem Big problem –Communicate the problem –Develop a new/improved solver

29 Possible Solver Outcomes (pg. 63) Optimization Model Run Solver Optimal Solution Found Unbounded Problem  Infeasible Problem 

30 Unbounded Problem How will you know: What it means: –Possible to achieve infinite profit Either you will become filthy rich, or (more likely) there is something wrong with your model How to fix it: look for missing constraints

31 Infeasible Problem How will you know: What it means: –Impossible to satisfy all constraints Possible reasons: –You need more resources –You over-constrained the problem

32 Unbounded/Infeasible Problem Means solver cannot solve The values returned are meaningless –You need to look at your model

33 Is the plan still optimal? If not, how will it change? (pg. 65) 1.Howie realizes that he underestimated the net margin for each AS by $65. 2.Howie realizes that he overestimated the net margin for each AS by $65. 3.Howie discovers a new market where he can sell both AS and HLs at a 20% higher net margin than originally estimated.

34 More Post-Optimality Analysis 4.Another semiconductor supplier offers Howie 5 more PsoCs for a premium of $150 each (above and beyond the going rate of $720 per unit). Should Howie buy these PSoCs? 5.Howie sometimes helps out with programming the LCDs, thereby increasing the amount of available programming time. Should he help out in this cycle? If so, how long should he help out? 6.Howie’s nephew offers to work in assembly for a premium rate of $12 per hour (above and beyond the going rate of $20 per hour). Should Howie hire his nephew? For how many hours?

35 SolverTable (pg. 67) Combines Solver and Data Table Solves the problem repeatedly and reports all solutions Free add-in –see COURSE DOCUMENTS > RESOURCES > SOFTWARE on course web

36 Excel Solver Advantages (pg. 69) comes with Excel (no additional cost) has the same familiar user interface as other Excel components can solve problems with integer constraints and nonlinear problems can be automated using VBA

37 Excel Solver Disadvantages limited to 200 variables and 100 constraints (Premium: 800 variables, no limit on constraints) somewhat inconvenient (Ex: B12 + B13 ≤ B14 not allowed) can be slow when solving large problems with integer constraints (Premium Solver much faster) not very reliable (sometimes fails to find a solution) (Premium is more robust)

38 Other solvers Survey –http://lionhrtpub.com/orms/surveys/LP/LP-survey.html $1,000... $10,000 Can solve very large problems (200,000 constraints) Usually require front-end modeling language Premium solver: $1,000 http://www.solver.com/


Download ppt "Preparing for Quiz 1 Review notes, assignments Take practice quiz Read Tips on Taking On-line Exams Get a good night's rest Quiz 1 coverage: up to and."

Similar presentations


Ads by Google