1 Hybrid & Module Testing Status Week of 4/25-4/29
2
2 UCSB Hybrid Testing Status WeeklyCumulative PassFailPassFail% Pass L12pd00000.00% L34p491368598.66% L56p190366598.65% R5N0065297.01% R5S00470100.00% R60087198.86% R700000.00% Total6819321398.62% Failing Hybrids Over-counted
3
3 UCSB Hybrid Testing Failures This Week 1 Too Many Opens Damaged PA Cumulative 3 with Shorts in PA Repairable 1 Major Scratch in PA 1 Smashed APV-PA Bonds Repairable 2 Failed Inspection Never should have sent 1 Broken Ceramic 1 Bad Bond Feet 1 Weak Wirebonds 1 Too Many Opens 2 with unknown failure
4
4 UCSB Hybrid Testing Issues Need to finish validation of new software Bruno contacted about bugs/features Need to add automatic upload of data to new software Hybrids with shorts need repairing Once repaired need to keep bookkeeping straight
5
5 UCSB ARCS Testing Status Weekly Cumulative ABFABF% A or B L12pu0000000.00% L12pd0000000.00% L12su0000000.00% L12sd0000000.00% L34p000851297.73% L56p40002771299.29% R5N600381197.50% R5S0000000.00% R644006800100.00% R70000000.00% Total90004683598.95%
6
6 UCSB ARCS Testing Failures This Week None Cumulative 1 with >2% Bad Channels Debris on sensor 1 Bad DCU 1 HV Shorted to CF Frame 2 with >20 A Bias Current 1 leaky pinhole 1 scratched sensor
7
7 UCSB ARCS Testing Issues Need to confirm cuts on TEC modules Getting some confusion between 1SO/2SO Have not produced TEC R6 modules in a year Still need to validate ARCS 8.0 Currently using ARCS 7.2bugfix
8
8 UCSB LT Testing Status Weekly Cumulative PassFailPassFail% Pass L12pu00000.00% L12pd00000.00% L12su00000.00% L12sd00000.00% L34p00840100.00% L56p3602590100.00% R5N503900.00% R5S00000.00% R6280430100.00% R700000.00% Total6904250100.00%