SPRINGETTSBURY TOWNSHIP.

Similar presentations


Presentation on theme: "SPRINGETTSBURY TOWNSHIP."— Presentation transcript:

1 SPRINGETTSBURY TOWNSHIP

2 Springettsbury Township
Wastewater Treatment Plant

3 Springettsbury Watewater Treatment Plant
Service Area WWTP History BNR Upgrade UV Disinfection Upgrade Administration Addition Construction Costs

4 Service Area Approximate Population Serviced - 70,000
Springettsbury Township Windsor Borough Red Lion Borough Yoe Borough Dallastown Borough Windsor Township And Portions of: Manchester Township Spring Garden Township York Township Approximate Population Serviced - 70,000

5 Service Area Collection System within Springettsbury Includes
120 Miles of Gravity Sewer 7 Pumping Stations 20 Miles of Forcemain

6 Springettsbury Watewater Treatment Plant
Service Area WWTP History BNR Upgrade UV Disinfection Upgrade Administration Addition Construction Costs

7 Wastewater Treatment Plant History
The Springettsbury Wastewater Treatment Plant as it appeared in 1970 The Plant was Permitted for 8 Million Gallons Per Day

8 Wastewater Treatment Plant History
In 1984 the Wastewater Treatment Plant Underwent an Upgrade and Expansion to 15 Million Gallons Per Day

9 Springettsbury Watewater Treatment Plant
Service Area WWTP History BNR Upgrade UV Disinfection Upgrade Administration Addition Construction Costs

10 BNR Upgrade Project Why Upgrade in 2011? PA DEP Bay Strategy
Biological Nutrient Removal (BNR) Reduce Nitrogen and Phosphorous discharges to the Chesapeake Bay

11 BNR Upgrade Project 2011 BNR Upgrade BNR Strategy
The main goal of this project was to design a BNR system that would meet the new effluent requirements without incurring the substantial expense of building new tanks (about 25 % more expensive).

12 BNR Upgrade Project Integrated Fixed Film System (IFAS)
Conventional Aeration Systems – Microorganisms are suspended in tank IFAS Systems – Microorganisms are attached to a suspended media; media offers greater surface area for microorganisms to grow More microorganisms: Provide higher degree of treatment Can offset the need for additional aeration basin capacity

13 BNR Upgrade Project Kruger IFAS System Media Facts -38% Fill
-85,000 CF - 274 SF/CF -23M SF - 536 ACRES

14 BNR Upgrade Project BNR System Site Plan North Train Influent
To 2nd Clarifiers Anaerobic Anaerobic Anoxic Stage #1 (N1) Oxic (IFAS) Stage #2 (N2) Oxic Stage #3 (N3) Sludge Digesters (N4) Anaerobic Influent Internal Nitrate Recycle Internal Nitrate Recycle Anaerobic Anoxic Stage #1 (N1) Oxic (IFAS) Stage #2 (N2) Oxic Stage #3 (N3) Sludge Digesters (N4) Anaerobic Anaerobic RAS South Train To 2nd Clarifiers

15 BNR Upgrade Project Media Retention Screens - 50 Screens -16” Diameter
-10’ Long

16 BNR Upgrade Project Additional Upgrades Required
New High Efficiency Diffused Air System Blowers and Blower Building Internal Mixed Liquor Recycle Pumps Conversion of Primary Clarifiers to Anaerobic/ Anoxic Selectors (anaerobic portion for phosphorous removal; anoxic portion for nitrogen removal)

17 BNR Upgrade Project Additional Plant Considerations
Motor Control Center (MCC) Upgrade Emergency Power Upgrade Final Clarifier Improvements Current Density Baffles Algae Control System Headworks Screening System Upgrade Relocated Septage Dump Station

18 BNR Upgrade Project Influent Screening is CRITICAL 3 mm opening

19 Springettsbury Watewater Treatment Plant
Service Area WWTP History BNR Upgrade UV Disinfection Upgrade Administration Addition Construction Costs

20 UV Disinfection Upgrade
Enaqua UV Disinfection System UV Lights do not Contact the water

21 UV Disinfection Upgrade
Enaqua UV Disinfection System Contact UV reactor configuration UV Lamps Flow in Flow out Front view Non - Contact UV reactor configuration UV Lamps Flow in Flow out Flow in Flow out Front view Flow tubes Side view 21

22 UV Disinfection Upgrade

23 Springettsbury Watewater Treatment Plant
Service Area WWTP History BNR Upgrade UV Disinfection Upgrade Administration Addition Construction Costs

24 Administration Addition
18 MGD Unit ready for Channel Mount Enhanced Security Required Post 9/11 Added Needed Office/Storage Space Added Multi-Use Training Room Existing Lab Updated

25 Administration Addition

26 Administration Addition
"Green" Features Use of Regional Materials for Construction New High Efficiency Geothermal Heating/ Cooling Energy Efficient Windows throughout Building Passive Heating in Conference Room Day Lighting Throughout Entire Addition

27 Springettsbury Watewater Treatment Plant
Service Area WWTP History BNR Upgrade UV Disinfection Upgrade Administration Addition Construction Costs

28 Construction Costs - General $18M - Electrical $ 4M - Mechanical $ 1M
TOTAL $23M