Cornville Community Park Conceptual Design Recreation Area and Facility Design Class April 9, 2008
2
Potential Land Acquisition
3
Draft Conceptual Design
4
Section Q - Design
5
Section Q - Revised
6
Section R - Design
7
Estimated Construction Costs Community Center 75’x75’ = $843,750 Ramada’s (6) 15’x15’ @ $17,000 ea = $102,000 Group Ramada (1) 40’x40’ @ $55,000 Playgrounds (2) 40x40 = $95,000 Benches 15 x $300 = $4,500 Bathrooms $100,000 Lighting (4 poles) $3,000 69,816 sq ft concrete ($750 sq ft) walkway 4’interior/ 8’perimeter= $523,620 Main parking lot 4,800 sq ft ($12 sq ft) = $57,600 Rim parking lot 1,280 sq ft ($12 sq ft) = $15,360 Estimated Cost $1,742,230 Estimated maintenance cost $6,000/acre x 30 acres= $180,000 per year
8
Now What? Submit final document by the end of April to CCA Include land acquisition recommendations Recommend funding sources Future consulting services
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.