Download presentation
Presentation is loading. Please wait.
1
Jet and MET HLT Monitoring for HI Running Ken Johns, Sam Silva, Venkat Kaushik, (U. Arizona)
2
Jet and MET HLT Triggers Jet triggers at EF only EF_j*_a2hi_EFFS_L1ZDC j15, j20, j25, j30, j40, j50, j75 EF_j*_a4hi_EFFS_L1ZDC j15, j20, j75, j100, j150 MET triggers at L2, EF Waiting to hear back from MET Slice group EF_xe_NoCut_allL1_noMu_Mon L2_xe_NoCut_allL1_noMu_Mon 2
3
Work List Change OHP configuration file (KJ) Ensure changes are made to online code Change offline and Han configuration file (VK) References Can be central reference or one we provide shortly after running starts Time frame End of October and then switch during HI commissioning 3
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.