Presentation is loading. Please wait.

Presentation is loading. Please wait.

Motherboard Status (October 2002) La Marra Daniel University of Geneva.

Similar presentations


Presentation on theme: "Motherboard Status (October 2002) La Marra Daniel University of Geneva."— Presentation transcript:

1 Motherboard Status (October 2002) La Marra Daniel University of Geneva

2 15 oct 2002University of Geneva2 schematic modifications due to the PDR JTAG chain serial impedance adaptation serializer back lines fuse on +3.3V for each mezzanine water cooling and temperature probes adding of LED on the front panel need some feedback about the ORx & GLinks problems From Nevis or Jingbo Ye meeting with LAPP (J.-M. Nappa) about the PCB routing: change on the stack-up try to use the automatic router General Status

3 15 oct 2002University of Geneva3 Stack-up

4 15 oct 2002University of Geneva4 PCB

5 15 oct 2002University of Geneva5 There is still a lot of things to do. We hope to gain time with the automatic router But before to use it. finalise the schematics place precisely all the components on the board resistors capacitors jumper extract manually lines from the BGA devices Conclusion


Download ppt "Motherboard Status (October 2002) La Marra Daniel University of Geneva."

Similar presentations


Ads by Google