Download presentation
Presentation is loading. Please wait.
1
1 In last Friday meeting, containment plot had some error. 10T-10E containment using 10T-10E and 10T-10E-20H geometries sho wed inconsistent values. Containment normalization was problem. I used two way for different geometry. Normalization using true E (for finite detector) Normalization by forcing last bin of integration plot to be 1. (for infinite d etector) This applies overall multiplication for each of tracker, ecal and hcal calibratio n if detector didn’t collect 100% energy. TP containment
2
2 Hcal Recalibration using Tracker+Ecal+infinite Hcal Original Hcal calibration was 12.26 New Hcal calibration is ~15.5 (26% increased) 10T-10E-H 10T-9E-H10T-8E-H
3
3 Containment after Hcal recalibration
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.