Control Chart for Attributes Bahagian 1
2
Introduction Many quality characteristics cannot be conveniently represented numerically. In such cases, each item inspected is classified as either conforming or nonconforming to the specifications on that quality characteristic. Quality characteristics of this type are called attributes. Examples are nonfunctional semiconductor chips, warped connecting rods, etc,.
3
p charts: proportion of units nonconforming. np charts: number of units nonconforming. c charts: count of nonconformities. u charts: count of nonconformities per unit. Control Charts for Variables Data X and R charts: for sample averages and ranges. Md and R charts: for sample medians and ranges. X and s charts: for sample means and standard deviations. X charts: for individual measures; uses moving ranges. Types of Control Charts Control Charts for Attributes Data
4
Type of Attribute Charts p charts This chart shows the fraction of nonconforming or defective product produced by a manufacturing process. It is also called the control chart for fraction nonconforming. np charts This chart shows the number of nonconforming. Almost the same as the p chart. c charts This shows the number of defects or nonconformities produced by a manufacturing process. u charts This chart shows the nonconformities per unit produced by a manufacturing process.
5
p charts In this chart, we plot the percent of defectives (per batch, per day, per machine, etc.). However, the control limits in this chart are not based on the distribution of rate events but rather on the binomial distribution (of proportions).
6
Formula Fraction nonconforming: p = (np)/n where p = proportion or fraction nc in the sample or subgroup, n = number in the sample or subgroup, np = number nc in the sample or subgroup.
7
Example During the first shift, 450 inspection are made of book- of the month shipments and 5 nc units are found. Production during the shift was 15,000 units. What is the fraction nc? p = (np)/n = 5/450 = 0.011 The p, is usually small, say 0.10 or less. If p > 0.10, indicate that the organization is in serious difficulty.
8
p-Chart contruction for constant subgroup size Select the quality characteristics. Determine the subgroup size and method Collect the data. Calculate the trial central line and control limits. Establish the revised central line and control limits. Achieve the objective.
9
Select the quality characteristics The quality characteristic? A single quality characteristic A group of quality characteristics A part An entire product, or A number of products.
10
Determine the subgroup size and method The size of subgroup is a function of the proportion nonconforming. If p = 0.001, and n = 1000, then the average number nc, np = 1. Not good, since a large number of values would be zero. If p = 0.15, and n = 50, then np = 7.5, would make a good chart. Therefore, the selection subgroup size requires some preliminary observations to obtain a rough idea of the proportion nonconforming.
11
Collect the data The quality technician will need to collect sufficient data for at least 25 subgroups. The data can be plotted as a run chart. Since the run chart does not have limits, its is not a control chart.
12
Calculate the trial central line and control limits The formula: = average of p for many subgroups n = number inspected in a subgroup
13
Sub- group Number Inspected n npp 1300120.040 230030.010 330090.030 430040.013 530000.0 630060.020 730060.020 830010.003 19300160.053 2530020.007 Total7500138 Negative value of LCL is possible in a theoritical result, but not in practical (proportion of nc never negative).
14
p Chart p-bar LCL UCL Subgroup p 5 10 15 20 25 0 0.01 0.02 0.03 0.04 0.053
15
Establish the revised central line and control limits Determine the standard or reference value for the proportion nc, p o. where np d = number nc in the discarded subgroups n d = number inspected in the discarded subgroups
16
Revised control limits where p o is central line
17
Achieve the objective The first 5 steps are planning (p304-308). The last step involves action and lead to the achievement of the objective. The revised control limits were based on data collected in May. For June, July, August? See Fig 8-3, p.310 Quality improved?
18
Analysis of June results shows the quality improved. Using June data, a better estimation of proportion nc is obatained. The new value: p o = 0.014, UCL = 0.036 Data from July are used to determine CL & UCL for August.
19
np Chart The np chart is almost the same as the p chart. Central line = np o If po is unknown, it must be determined by collecting data, calculating UCL, LCL.
20
Example
22
c Chart The procedures for c chart are the same a s those for the p chart. If count of nonconformities, co, is unknown, it must be found by collecting data, calculating UCL & LCL. = average count of nonconformities
23
Example
25
Revised Out-of-control: sample no. 5, 11, 23.
26
u Chart The u chart is mathematically equivalent to the c chart.
27
Example
28
For January 30:
30
Nonconformity Classification Critical nonconformities Indicate hazardous or unsafe conditions. Major nonconformities Failure Minor nonconformities
31
Control Charts for Variables vs. Charts for Attributes Sometimes, the quality control engineer has a choice between variable control charts and attribute control charts.
32
Advantages of attribute control charts Allowing for quick summaries, that is, the engineer may simply classify products as acceptable or unacceptable, based on various quality criteria. Thus, attribute charts sometimes bypass the need for expensive, precise devices and time-consuming measurement procedures. More easily understood by managers unfamiliar with quality control procedures.
33
Advantages of variable control charts More sensitive than attribute control charts. Therefore, variable control charts may alert us to quality problems before any actual "unacceptables" (as detected by the attribute chart) will occur. Montgomery (1985) calls the variable control charts leading indicators of trouble that will sound an alarm before the number of rejects (scrap) increases in the production process.
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.