Presentation is loading. Please wait.

Presentation is loading. Please wait.

CSC DQA Status Ken Johns, Venkat Kaushik, Caleb Lampen, Xiaowen Lei (U. Arizona)

Similar presentations


Presentation on theme: "CSC DQA Status Ken Johns, Venkat Kaushik, Caleb Lampen, Xiaowen Lei (U. Arizona)"— Presentation transcript:

1 CSC DQA Status Ken Johns, Venkat Kaushik, Caleb Lampen, Xiaowen Lei (U. Arizona)

2 CSC Status  Other than a small number of noisy channels, the CSC performance is stable and in good shape

3 CSC Online DQA  CSC GNAM CSC GNAM, OHP, DQMF, COOL flags running reliably CSC GNAM recently changed to Reset at Warm Start  Will likely change to Reset at First Warm Start and Fill When Ready when this option is available  CSC GNAM using Calib Stream Developed and tested (offline) Currently produces empty histograms as CSC’s not in Calib Stream (see later)

4 CSC Offline DQA  CSC RawDataMonitoring CSC Tier0, HAN, DQMF, COOL running reliably Used for SHFTOFL flags In progress,  PRD, Cluster monitoring being moved to the ESD-AOD xform (T. Kittelmann)  Segment monitoring tested but needs tag for Tier0  Post-processing monitoring (efficiencies, Laudau mpv, etc.) tested but needs tag for Tier0  CSC-TGC correlation monitoring just starting

5 CSC Offline DQA  History plots We also developed software to web display user specified Tier0 histograms for user specified run numbers

6 CSC Calibration Center Monitoring  CSC Calibration Center (CC) monitoring software is being resurrected CSC data should be included in the Calibration stream (once stable beam returns)  Was turned off in March for unknown reasons Once this is verified (need stable beam) processing at the CC needs to be (re)validated Software development to cross-check electronic calibration constants using CC root-tuple is in progress  Thanks to A. Di Mattia and F. Petrucci for help with first two items

7 Pedestal and Electronic Calibration Monitoring  Pedestal monitoring in place (C. Lampen) Automatically generates monitoring web pages  Pedestal values  Pedestal RMS  χ 2 of pedestal Gaussian fit  Attempts to highlight noisy channels and deviations from nominal values  In development: COOL based historical survey of pedestal runs


Download ppt "CSC DQA Status Ken Johns, Venkat Kaushik, Caleb Lampen, Xiaowen Lei (U. Arizona)"

Similar presentations


Ads by Google