Download presentation
Presentation is loading. Please wait.
1
Detector Systems Update MICO April 23, 2008
2
MICE Detector Systems CKOV u Nothing new TOF0/1 u Tests to identify the source of the problems in the PMTs are on going. u Next week Dr. Yoshizawa of Hamamatsu PMT research division is going to Milano to try to help understand the source of problems. Calorimeter u Calibrations of the KL modules have been concluded. u The detector has been dismantled and put in horizontal position ready for packing. u Further modifications to the provisional supporting trolley have been planned to match the mechanical support of TOF1. u Materials to build safe and robust boxes for shipment have been procured.
3
Tracker Electronics u Progress on Firmware u Multi-board readout with all 4 boards on Cryostat #1 has been accomplished. u Work will continue this week to move on to readout of the full Tracker 1 readout system (8 boards) and then work will move on to LED testing and full cassette characterization.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.