Download presentation
Presentation is loading. Please wait.
1
Noor Fouad Al-Emadi IEEE 1074 Standard for Developing Life Cycle Processes
2
Objectives : 1- Processes and Activities. 2- Project Management. 3- Pre-Development. 4- development. 5- Post-development. 6- Integral Processes.
3
Processes and Activities. -Project management. -Pre-Development. -development. -Post-development. -Integral Processes.
4
Project Management ActivitiesProcess -Map Activities to Software Life Cycle. -Allocate Project Resources. -Establish Project Environment. -Plane Project Management. Project Initiation -Analyze Risks. -Perform Contingency Planning. -Manage the Project. -Retain Records. -Implement Problem Reporting Mode. Project Monitoring and Control -Plan Software Quality Management. -Define Metrics. -Manage Software Quality. -Identify Quality Improvement Needs. Software Quality Management
5
Pre-Development. Concept Exploration System Allocation
6
Concept Exploration -Identify Ideas or Needs. -Formulate Potential Approaches. -Plan System Transition. -Refine and Finalize the Idea or Need.
7
System Allocation -Analyze Functions. -Develop System Architecture. -Decompose system Requirements.
8
development. Requirements Design Implementation
9
Post-development ActivitiesProcess -Plan Installation. -Distribution of Software. -Installation of Software. -Accept Software in operational Environment. Installation -Operate the System. -Provide Technical Assistance. -Maintain Support Request Log. Operation and Support -Reapply Software Life Cycle Maintenance -Notify Users. -Conduct Parallel Operations. -Retire System. Retirement
10
Integral Processes -Verification and Validation. -Software Configuration Management. -Documentation Development.
11
Thank you
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.