Presentation is loading. Please wait.

Presentation is loading. Please wait.

EUFORIA FP7-INFRASTRUCTURES-2007-1, Grant 211804 JRA3 B. Guillerminet on behalf of the JRA3 project 22 January 2008 Kick-Off Meeting 21-24 January 2008.

Similar presentations


Presentation on theme: "EUFORIA FP7-INFRASTRUCTURES-2007-1, Grant 211804 JRA3 B. Guillerminet on behalf of the JRA3 project 22 January 2008 Kick-Off Meeting 21-24 January 2008."— Presentation transcript:

1 EUFORIA FP7-INFRASTRUCTURES-2007-1, Grant 211804 JRA3 B. Guillerminet on behalf of the JRA3 project 22 January 2008 Kick-Off Meeting 21-24 January 2008 Goteborg (Sweden)

2 EUFORIA FP7-INFRASTRUCTURES-2007-1, Grant 211804 Outline Participants Objectives of JRA3  Portal  Jobs launching  Data access  Codes orchestration  Visualization  Service administration Connections with the others activities Plans  Road map  Risks assessment

3 EUFORIA FP7-INFRASTRUCTURES-2007-1, Grant 211804 WHO Participants:  PNSC: 24 months (N Meyer, M Owsiak, B Palak, M Ptocennik)  UEDIN: 8 months (L Smith, J Hein)  Chalmers: 4 months (P Strand, T Svedberg, D Nilsson)  IPP: 8 months (D Coster)  CEA: 16 months (M Airaj, B Guillerminet)  ULP: 8 months (E Sonnendrucker, R David, P Navarro) Structure  JRA3 leader & coordinator of JRA3/JRA4: B Guillerminet (CEA)

4 EUFORIA FP7-INFRASTRUCTURES-2007-1, Grant 211804 Objectives What

5 EUFORIA FP7-INFRASTRUCTURES-2007-1, Grant 211804 Objective: Portal Requirements:  single access point (based on ROAM, Shibboleth, SAFE …?)  access to applications (based on Migrating Desktop): Data (codes & simulations) mining tool (catalogues + database) Simulation parameters editor (Java based) KEPLER: workflow (Java based) Post-processing tools (SCILAB, VISIT …)  user queries  Accounting, monitoring Tasks:  Specify & realize the Web portal  Integrate our applications in the portal Who?  PNSC (24 months)  UEDIN (8 months)  Chalmers (?)  IPP (?)  CEA & ULP participate to the integration & tests of the applications

6 EUFORIA FP7-INFRASTRUCTURES-2007-1, Grant 211804 Objective: Jobs launching Requirements:  Complex workflows: loops, various directors, sequential & parallel execution  Long duration simulations: jobs could be launched at each time step (batch) and some must be kept alive (call + notification: interactive jobs)  Need a Java API for EGEE (gLite based) & HPC (UNICORE 6): temporary certificate, job submission, get job status, get job output + message oriented middleware (call + notification)  Integration in the workflow engine (Kepler) Status:  EGEE: Globus version (already in Kepler)  gLite: in progress  Migrating Desktop as a “gateway” between Kepler and GRID/HPC infrastructure Needs:  Access to EGEE (gLite + VO fusion) & HPC (unicore 6) infrastructures  Support + investigation for the non-batch part (interactive jobs?) Who?  CEA (6 months / 16)  PNSC Proxy Job transfer via FTP Data transfer via FTP Job scheduli ng via JCL

7 EUFORIA FP7-INFRASTRUCTURES-2007-1, Grant 211804 Objective: Data access Requirements:  Access to external data (EGEE/HPC): open, get, put … a data structure (allocatable array)  Fast access: in-memory data during the simulation (avoid memory to file + file transfer + …)  Integration in the UAL (Many languages implementation: C/C++, F90, Java, …) Must be defined clearly: connection with SA3 for SAFE Needs:  Access to EGEE (gLite + VO fusion) & HPC (unicore 6) infrastructures: SA1 & SA2  Investigation with the biomedical & astronomy projects (EuroVO_AIDA.pdf @ 4th …)  Support: SA3 Who?  CEA (4 months / 16)  Chalmers (?)  IPP (?)

8 EUFORIA FP7-INFRASTRUCTURES-2007-1, Grant 211804 Objective: Codes orchestration Requirements:  Codes launching (EGEE/HPC) and coupling from the workflow engine: use the previously provided libraries  Distributed workflow: part of the workflow will run on the gateway, on EGEE and on HPC  Integration of codes: JRA1, JRA2 deliverables  Building a workflow based on ITM & JRA1/2 codes Needs:  Investigation of various workflow engines: Gridway, … => collaboration or support  Collaboration with UCSD (Kepler team): designing tool for distributed workflows Who?  CEA (6 months / 16)  IPP : building the workflow?

9 EUFORIA FP7-INFRASTRUCTURES-2007-1, Grant 211804 Objective: Visualization Tasks:  Integrate the new visualization tools (based on VTK, Visit) in the code platform: Developments of specific actors Used in a workflow (during the simulation) As post-processing tool  Integration of the compression algorithm (deliverable from JRA4)? actor or as a library Needs:  Collaboration with JRA4: deliverable, training … Who?  CEA (<1 months / 16)  ULP (?)

10 EUFORIA FP7-INFRASTRUCTURES-2007-1, Grant 211804 Objective: Service administration Requirements:  Deliverable from SA3: User administration Resource management Accounting Reporting  Tool based on SAFE (UEDIN) Task  Integration in the portal Needs  Training on SAFE and support from SA3 Who?  PNSC (24 months)  UEDIN (8 months)

11 EUFORIA FP7-INFRASTRUCTURES-2007-1, Grant 211804 Connection with the others activities NA1, NA2, NA3  Management: bi-weekly, f2f (3 months), GA (1 year)  Training on GRID, HPC, SAFE, Migrating Desktop  Dissemination SA1, SA2, SA3  Login & CPU time to develop & test our software  Help  Implementation of the service administration facilities

12 EUFORIA FP7-INFRASTRUCTURES-2007-1, Grant 211804 Connection with the others activities JRA1, JRA2  JRA1, JRA2 provide several codes  Execution using the API  Needs for orchestration  Data access (ITM data structure)? JRA4  JRA3 provides Kepler + tools  Development of actors and integration of VTK, Visit, …  Actor for data compression

13 EUFORIA FP7-INFRASTRUCTURES-2007-1, Grant 211804 Road map  Work is mainly in 2008 & 2009 Plans 2008 20092010

14 EUFORIA FP7-INFRASTRUCTURES-2007-1, Grant 211804 Deliverables Plans 2008

15 EUFORIA FP7-INFRASTRUCTURES-2007-1, Grant 211804 Risks assessment Jobs launching:  only the batch mode is available => simulations will be less efficient Data access  No external data => could use file transfer (GridFTP …) => hidden to the user Orchestration  No way to run a part of Kepler on the GRID/HPC => use Gridway and build a tool to convert the Kepler workflow to Gridway Plans 2008

16 EUFORIA FP7-INFRASTRUCTURES-2007-1, Grant 211804 Work methods Define precisely the work plan (JRA3 parallel session) Email as a communication tool Additional collaborative tools (Savannah, Wiki …)? Meetings: PSG (2 weeks) + F2F (3 months) => rely on NA1 management Mobility?


Download ppt "EUFORIA FP7-INFRASTRUCTURES-2007-1, Grant 211804 JRA3 B. Guillerminet on behalf of the JRA3 project 22 January 2008 Kick-Off Meeting 21-24 January 2008."

Similar presentations


Ads by Google