Download presentation
Presentation is loading. Please wait.
1
DTE Hydrogen Technology Park Project
2
The Project Team: Ed Chao Marshall Chase Kris Jadd Doug Glancy Advisors: Dr. Thomas P. Lyon Dow Professor of Sustainable Science, Technology, and Commerce Dr. Gregory A. Keoleian Co-Director, Center for Sustainable Systems Secondary Advisor: Dr. Gautam Kaul, Finance Professor
3
The Client: DTE Energy’s Technology Investments unit A diversified energy company involved in the development and management of energy- related businesses and services nationwide. Other participants: US Department of Energy DaimlerChrysler BP
4
What are they doing? “Distributed Hydrogen Generation” On-site generation of hydrogen, using electricity from the grid and solar cells to split water into hydrogen and oxygen Use hydrogen to fuel vehicles or generate electricity using fuel cells.
5
Hydrogen Fuel Cells
6
Liquid hydrogen storage tank One option: Fuel cell vehicles
7
Why are they looking at hydrogen? DTE wants to evaluate the feasibility of using hydrogen as an energy carrier. Potential to reduce greenhouse gas emissions and reduce dependence on foreign oil. Can store electricity from renewable and other sources Can be used in automobiles to replace gasoline Determine economic viability of the distributed hydrogen generation model. Gain experience in using hydrogen – potential competitive advantage
8
So where’s the problem? Hydrogen currently isn’t a financially viable alternative to the existing energy and vehicle fueling infrastructure. But this might change: Many regulatory and market factors affect the viability of a hydrogen infrastructure Price of oil Electricity cost differentials Regulations (RPSes, carbon regulations, etc)
9
Where do we fit in? Help DTE evaluate two things: What might future regulatory & market landscapes look like? What are the implications of these future scenarios for the viability of DTE’s distributed hydrogen generation model? Ultimate goals: Decide whether this distribution system has a chance of succeeding in the energy market. Provide DTE with the tools to conduct ongoing evaluations as circumstances change.
10
How? Literature review Interview energy & policy researchers and professionals Define market, policy and other variables likely to affect distributed hydrogen generation Develop set of likely scenarios based on above variables Design software input-output model using the above variables and scenarios to evaluate the financial and competitive viability and environmental impacts of DTE’s proposed stations.
11
Methodology Phase I: Project inception – May 30 Initial review of existing models in the field Literature review Initial client interviews Site Visit Phase II: June 1-September 1 Continue interviews and lit. review begin drafting model units and scenarios Deliverable: Initial model units and scenarios for presentation to advisors and client Phase III: September 1-December 20 Continue drafting model units and fleshing out scenarios Plug scenario variables into models, gather output Draft recommendations based on scenarios and model output Deliverables: Scenarios, models, and draft recommendations to advisors and client Phase IV: January 2-April 15 Draft reports submitted to advisors and client Revisions as needed Final reports and presentations to client and school Training of DTE representatives to use models
12
Project Roles: Primary client contact: Ed Chao Primary advisor contact: Marshall Team Finances: Kris Information controller: Marshall Team coordinator & meeting planner: Ed Team social chair: Kris
13
Budget Travel to project site, other DTE facilities, and interview and research sites Travel to one conference for presentation of results Telephone calls for interviews & discussions Data and reference material Relevant modeling software purchase and training Opus binding, 7 copies @ $150/copy Administrative overhead (photocopying, etc) Total $500 $1200 $150 $1500 $3000 $1050 $500 $7900
14
Results/Deliverables Distributed hydrogen energy station evaluation software-based model. Explanation of scenario forecasts, and discussion of conclusions and recommendations based on those scenarios. Presentation of the model, scenarios used, and recommendations to DTE representatives. Presentation and bound paper to fulfill the SNRE Master’s Project academic requirement.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.