K. Long, 16 June, 2015 MICE Muon Beam
2
Beam line and decay solenoid: Pressure reducing valves: Fitted to Q7—9; To be fitted to Q4—6 Upstream MLI: Plan to fit as presented at review; Cool down scheduled to take place over Easter: Clear instructions to baby sitters: Shutdown and make safe if there are issues that can not be resolved without presence of expert Volunteers required! LC has plan (see later), but manpower is short (usual ‘suspects’!)
3
Target: Production of jugs etc. has started: Welding and grinding jigs: AC @ RAL Production of parts has started: Bearing blanks: RH @ IC Test welding/test grinding: Hope for: Welding this week; Send to grinders next week