Presentation is loading. Please wait.

Presentation is loading. Please wait.

QEM: Management Science Introduction. Preliminary Program DateTopic 07.03.2011Intro, Location Problems 21.03.2011Configuration: Assembly line balancing.

Similar presentations


Presentation on theme: "QEM: Management Science Introduction. Preliminary Program DateTopic 07.03.2011Intro, Location Problems 21.03.2011Configuration: Assembly line balancing."— Presentation transcript:

1 QEM: Management Science Introduction

2 Preliminary Program DateTopic 07.03.2011Intro, Location Problems 21.03.2011Configuration: Assembly line balancing 04.04.2011Transportation problems, Aggregate planning 09.05.2011PPS, MPS 23.05.2011MRP, lotsizing 20.06.2011Production control, scheduling 27.06.2011Exam QEM - Chapter 12 (c) Prof. Richard F. Hartl

3 Decision Levels Strategic issues: long run, top management, poor data, highly stochastic (e.g. which markets, location, etc.) Tactical issues: medium run, intermediate management, better data, less stochastic (e.g. configuration, capacity expansion, …) Operational issues: short run, lower management, detailed data available, little stochastics (e.g. production progran, MRP, lotsizing, scheduling, …) QEM - Chapter 13 (c) Prof. Richard F. Hartl


Download ppt "QEM: Management Science Introduction. Preliminary Program DateTopic 07.03.2011Intro, Location Problems 21.03.2011Configuration: Assembly line balancing."

Similar presentations


Ads by Google