Download presentation
Presentation is loading. Please wait.
1
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Statistical Process Control Operations Management - 5 th Edition Chapter 4 Roberta Russell & Bernard W. Taylor, III
2
Copyright 2006 John Wiley & Sons, Inc.4-2 Lecture Outline Basics of Statistical Process Control Control Charts Control Charts for Attributes SPC with Excel
3
Copyright 2006 John Wiley & Sons, Inc.4-3 Basics of Statistical Process Control Statistical Process Control (SPC) monitoring production process to detect and prevent poor quality monitoring production process to detect and prevent poor quality Sample subset of items produced to use for inspection subset of items produced to use for inspection Control Charts process is within statistical control limits process is within statistical control limits UCL LCL
4
Copyright 2006 John Wiley & Sons, Inc.4-4 Variability Random common causes common causes inherent in a process inherent in a process can be eliminated only through improvements in the system can be eliminated only through improvements in the system Non-Random special causes special causes due to identifiable factors due to identifiable factors can be modified through operator or management action can be modified through operator or management action
5
Copyright 2006 John Wiley & Sons, Inc.4-5 SPC in TQM SPC tool for identifying problems and make improvements tool for identifying problems and make improvements contributes to the TQM goal of continuous improvements contributes to the TQM goal of continuous improvements
6
Copyright 2006 John Wiley & Sons, Inc.4-6 Quality Measures Attribute a product characteristic that can be evaluated with a discrete response a product characteristic that can be evaluated with a discrete response good – bad; yes - no good – bad; yes - no Variable a product characteristic that is continuous and can be measured a product characteristic that is continuous and can be measured weight - length weight - length
7
Copyright 2006 John Wiley & Sons, Inc.4-7 Nature of defect is different in services Service defect is a failure to meet customer requirements Monitor times, customer satisfaction Applying SPC to Service
8
Copyright 2006 John Wiley & Sons, Inc.4-8 Applying SPC to Service (cont.) Hospitals timeliness and quickness of care, staff responses to requests, accuracy of lab tests, cleanliness, courtesy, accuracy of paperwork, speed of admittance and checkouts timeliness and quickness of care, staff responses to requests, accuracy of lab tests, cleanliness, courtesy, accuracy of paperwork, speed of admittance and checkouts Grocery Stores waiting time to check out, frequency of out-of-stock items, quality of food items, cleanliness, customer complaints, checkout register errors waiting time to check out, frequency of out-of-stock items, quality of food items, cleanliness, customer complaints, checkout register errors Airlines flight delays, lost luggage and luggage handling, waiting time at ticket counters and check-in, agent and flight attendant courtesy, accurate flight information, passenger cabin cleanliness and maintenance flight delays, lost luggage and luggage handling, waiting time at ticket counters and check-in, agent and flight attendant courtesy, accurate flight information, passenger cabin cleanliness and maintenance
9
Copyright 2006 John Wiley & Sons, Inc.4-9 Applying SPC to Service (cont.) Fast-Food Restaurants waiting time for service, customer complaints, cleanliness, food quality, order accuracy, employee courtesy waiting time for service, customer complaints, cleanliness, food quality, order accuracy, employee courtesy Catalogue-Order Companies order accuracy, operator knowledge and courtesy, packaging, delivery time, phone order waiting time order accuracy, operator knowledge and courtesy, packaging, delivery time, phone order waiting time Insurance Companies billing accuracy, timeliness of claims processing, agent availability and response time billing accuracy, timeliness of claims processing, agent availability and response time
10
Copyright 2006 John Wiley & Sons, Inc.4-10 Where to Use Control Charts Process has a tendency to go out of control Process is particularly harmful and costly if it goes out of control Examples at the beginning of a process because it is a waste of time and money to begin production process with bad supplies at the beginning of a process because it is a waste of time and money to begin production process with bad supplies before a costly or irreversible point, after which product is difficult to rework or correct before a costly or irreversible point, after which product is difficult to rework or correct before and after assembly or painting operations that might cover defects before and after assembly or painting operations that might cover defects before the outgoing final product or service is delivered before the outgoing final product or service is delivered
11
Copyright 2006 John Wiley & Sons, Inc.4-11 Control Charts A graph that establishes control limits of a process Control limits upper and lower bands of a control chart upper and lower bands of a control chart Types of charts Attributes Attributes p-chart p-chart c-chart c-chart Variables Variables range (R-chart) range (R-chart) mean (x bar – chart) mean (x bar – chart)
12
Copyright 2006 John Wiley & Sons, Inc.4-12 Process Control Chart 12345678910 Sample number Uppercontrollimit Processaverage Lowercontrollimit Out of control
13
Copyright 2006 John Wiley & Sons, Inc.4-13 Normal Distribution =0 1111 2222 3333 -1 -2 -3 95% 99.74%
14
Copyright 2006 John Wiley & Sons, Inc.4-14 A Process Is in Control If … 1.… no sample points outside limits 2.… most points near process average 3.… about equal number of points above and below centerline 4.… points appear randomly distributed
15
Copyright 2006 John Wiley & Sons, Inc.4-15 Control Charts for Attributes p-charts uses proportion defective in a sample c-charts uses number of defects in an item
16
Copyright 2006 John Wiley & Sons, Inc.4-16 p-Chart UCL = p + z p LCL = p - z p z=number of standard deviations from process average p=sample proportion defective; an estimate of process average p = standard deviation of sample proportion p =p =p =p = p(1 - p) n
17
Copyright 2006 John Wiley & Sons, Inc.4-17 p-Chart Example 20 samples of 100 pairs of jeans NUMBER OFPROPORTION SAMPLEDEFECTIVESDEFECTIVE 16.06 20.00 34.04 ::: 2018.18 200
18
Copyright 2006 John Wiley & Sons, Inc.4-18 p-Chart Example (cont.) UCL = p + z = 0.10 + 3 p(1 - p) n 0.10(1 - 0.10) 100 UCL = 0.190 LCL = 0.010 LCL = p - z = 0.10 - 3 p(1 - p) n 0.10(1 - 0.10) 100 = 200 / 20(100) = 0.10 total defectives total sample observations p =
19
Copyright 2006 John Wiley & Sons, Inc.4-19 0.02 0.04 0.06 0.08 0.10 0.12 0.14 0.16 0.18 0.20 Proportion defective Sample number 2468101214161820 UCL = 0.190 LCL = 0.010 p = 0.10 p-Chart Example (cont.)
20
Copyright 2006 John Wiley & Sons, Inc.4-20 c-Chart UCL = c + z c LCL = c - z c where c = number of defects per sample c = c
21
Copyright 2006 John Wiley & Sons, Inc.4-21 c-Chart (cont.) Number of defects in 15 sample rooms 1 12 2 8 3 16 : : 15 15 190 190 SAMPLE c = = 12.67 19015 UCL= c + z c = 12.67 + 3 12.67 = 23.35 LCL= c + z c = 12.67 - 3 12.67 = 1.99 NUMBER OF DEFECTS
22
Copyright 2006 John Wiley & Sons, Inc.4-22 3 6 9 12 15 18 21 24 Number of defects Sample number 246810121416 UCL = 23.35 LCL = 1.99 c = 12.67 c-Chart (cont.)
23
Copyright 2006 John Wiley & Sons, Inc.4-23 Control Chart Patterns UCL LCL Sample observations consistently above the center line LCL UCL Sample observations consistently below the center line
24
Copyright 2006 John Wiley & Sons, Inc.4-24 Control Chart Patterns (cont.) LCL UCL Sample observations consistently increasing UCL LCL Sample observations consistently decreasing
25
Copyright 2006 John Wiley & Sons, Inc.4-25 Zones for Pattern Tests UCL LCL Zone A Zone B Zone C Zone B Zone A Process average 3 sigma = x + A 2 R = 3 sigma = x - A 2 R = 2 sigma = x + (A 2 R) = 2323 2 sigma = x - (A 2 R) = 2323 1 sigma = x + (A 2 R) = 1313 1 sigma = x - (A 2 R) = 1313 x = Sample number |1|1 |2|2 |3|3 |4|4 |5|5 |6|6 |7|7 |8|8 |9|9 | 10 | 11 | 12 | 13
26
Copyright 2006 John Wiley & Sons, Inc.4-26 Control Chart Patterns 8 consecutive points on one side of the center line 8 consecutive points up or down across zones 14 points alternating up or down 2 out of 3 consecutive points in zone A but still inside the control limits 4 out of 5 consecutive points in zone A or B
27
Copyright 2006 John Wiley & Sons, Inc.4-27 Performing a Pattern Test 14.98B—B 25.00BUC 34.95BDA 44.96BDA 54.99BUC 65.01—UC 75.02AUC 85.05AUB 95.08AUA 105.03ADB SAMPLExABOVE/BELOWUP/DOWNZONE
28
Copyright 2006 John Wiley & Sons, Inc.4-28 Sample Size Attribute charts require larger sample sizes 50 to 100 parts in a sample Variable charts require smaller samples 2 to 10 parts in a sample
29
Copyright 2006 John Wiley & Sons, Inc.4-29 SPC with Excel UCL=0.19 LCL=0.01
30
Copyright 2006 John Wiley & Sons, Inc.4-30 SPC with Excel: Formulas
31
Copyright 2006 John Wiley & Sons, Inc.4-31 Copyright 2006 John Wiley & Sons, Inc. All rights reserved. Reproduction or translation of this work beyond that permitted in section 117 of the 1976 United States Copyright Act without express permission of the copyright owner is unlawful. Request for further information should be addressed to the Permission Department, John Wiley & Sons, Inc. The purchaser may make back-up copies for his/her own use only and not for distribution or resale. The Publisher assumes no responsibility for errors, omissions, or damages caused by the use of these programs or from the use of the information herein.
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.