Compressor ReVamp and Fabrication PO9452
2
Update Revised Concept Generation Selected some concepts Scheduled Conference call with Dresser Rand Schedules Visit to Dresser Rand for Week 5 to have Design Review
3
Architecture
4
Sub System Break Down
5
Installation -Room Reinforcements/Structural Analysis -Electrical (Contractor) -HVAC (Contractor) -Water Supply (Contractor) -Rigger and Install (Contractor) -Noise and Vibration Control -Room Access/Safety -Installation Guide Setup and Configuration -Safety Training/Signage -Accessible Documentation -Sensor Connection - Computer and Software installation Safety -Eye/Ear Protection -Call out moving signs -Physical Buffers -Emergency Shutoffs -Training (Dresser-Rand) -Operation & Maintenance Manual Teaching Interface -Data Acquisition -Custom Interface Per Class -Lab Manuals, Guides, Examples -Usability Tests -Staff Feedback Research Tool -Data Acquisition -Variable valve timing Mechanism -Analyses DAQ -LabView Sensors -Documentation -Layout & Configuration -Analysis and Modeling -Custom Sensors -Analysis Analyses
6
Risks Concerns The compressor drawings given are preliminary Since team is not receiving compressor, actual tests can’t be done to collect data with acquisition unit
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.