Fieldbus Roadmap NeSSI Workshop May 5, 2005 NeSSI Workshop May 5, 2005.

Similar presentations


Presentation on theme: "Fieldbus Roadmap NeSSI Workshop May 5, 2005 NeSSI Workshop May 5, 2005."— Presentation transcript:

1 Fieldbus Roadmap NeSSI Workshop May 5, 2005 NeSSI Workshop May 5, 2005

2 Enterprise Data Layers Company Management Data Presentation Company Management Information Company Production Assignment Scheduling Supervision Company Production Scheduling Assignment Operational & Production Supervision Production Scheduling & Operational Management Supervisor’s Console Inter-Area Coordination Supervisor’s Console Supervisory Control Operator’s Console Direct Digital Control Level 5 Level 4 Level 3 Level 2 Level 1 Controllers Process IT Security Policies and Practices (ISO 17799) Mfg Security Policies and Practices (ISA 99) Common technologies, policies and practices Process Safety (ISA 84, IEC 61508, IEC 61511) Purdue reference Model Levels Safety Critical H1 HSE Ethernet

3 Fieldbus Today H1 Devices available > 500,000 devices installed > 4,000 systems Layers 0 and 1 of enterprise High Speed Ethernet (HSE) products within last year+ Flexible Function Block H1 Devices available > 500,000 devices installed > 4,000 systems Layers 0 and 1 of enterprise High Speed Ethernet (HSE) products within last year+ Flexible Function Block

4 Physical Layer FF-831 in 2004 to certify Power Supplies/Conditioners Additional Standards in development Variety of connection types available Terminal Plug New smaller form factors in development Ohm’s Law will impact distances FF-831 in 2004 to certify Power Supplies/Conditioners Additional Standards in development Variety of connection types available Terminal Plug New smaller form factors in development Ohm’s Law will impact distances

5 Under Development Safety Bus Apply Fieldbus in Safety Systems EDDL Graphical and archival support Safety Bus Apply Fieldbus in Safety Systems EDDL Graphical and archival support

6 Fieldbus for Safety Instrumented Systems (FF-SIS) End User Initiated Project – Approved October 2002 Based on the IEC 61508 International Standard Protocol Supports SIL 2 and 3 Applications Centralized and Distributed Logic Solver Options Reduces Total Cost of Ownership for SIS CAPEX - Hardware, Footprint, Commissioning, Power OPEX - Advanced Diagnostics, Reduced Test Interval Improves Asset Management Information for FF-SIS and Non-SIS Devices Available End User Initiated Project – Approved October 2002 Based on the IEC 61508 International Standard Protocol Supports SIL 2 and 3 Applications Centralized and Distributed Logic Solver Options Reduces Total Cost of Ownership for SIS CAPEX - Hardware, Footprint, Commissioning, Power OPEX - Advanced Diagnostics, Reduced Test Interval Improves Asset Management Information for FF-SIS and Non-SIS Devices Available

7 IEC 61158 - PHY IEC 61158 - FMS IEC 61158 - FAS IEC 61158 - DLL IEC 61804 Black Channel No Change to H1 Same DD as H1 FF-SIS Extensions Developed using IEC 61508 FF-SIS Standardization

8 New Function Blocks for SIS Applications – FBAP Part 6 New FBAP diagnostics detect application faults and appropriate action can be taken without human intervention. New Function Blocks for SIS Applications – FBAP Part 6 New FBAP diagnostics detect application faults and appropriate action can be taken without human intervention. IEC 61508 Black Channel SIS User Layer Extensions New SIS Function Blocks & Function Block Diagnostics

9 OperationEngineering Proprietary Network SIS Logic Hardwired H1 OperationEngineering Total Asset Management HSE SIS FF Devices SIS – Open Fieldbus Solution Linking Device H1 Non-SIS FF Devices Linking Device Ethernet Switch....

10 SIS_ DI SIS_ AVTR SIS_ DO Write Lock (WL) S SIS_ WL SIS_ AI SIS_ RB SIS_ WL SIS_ AI SIS_ RB SIS_ WL SIS_ AI SIS_ RB SIS_ WL SIS_ RB Example SIS Application Analog 2 out of 3 Voter

11 SIS Development Schedule 2002 4Q FF Board of Director Approval for SIS Project 2003 1Q Project Kickoff Meeting 2Q Architecture Completed 3Q Draft Preliminary Specifications (DPS) Version 0.4 4Q TÜV Concept Approval for SIS 2004 1Q DPS Version 0.5 External Review 2Q DPS Version 0.9 3Q DPS Version 1.0, Develop Lab Test Tools and Lab Prototypes 4Q Begin Specification Validation Lab Testing @ Infraserv in Frankfurt 2005 – Release Final SIS Specifications and Final TÜV Type Approval 2006 – First Safety-Certified, FF-Registered Devices

12 Electronic Device Description Language (EDDL) IEC 61804 Function Blocks (FB) for Process Control Part 1: Overview of system aspects Part 2: Specification of FB concept and Electronic Device Description Language (EDDL) Covers DDL used in the F OUNDATION ™ fieldbus, HART ® and Profibus communication protocol International Standard in March 2004 IEC 61804 Function Blocks (FB) for Process Control Part 1: Overview of system aspects Part 2: Specification of FB concept and Electronic Device Description Language (EDDL) Covers DDL used in the F OUNDATION ™ fieldbus, HART ® and Profibus communication protocol International Standard in March 2004

13 EDDL Benefits Established – millions of devices worldwide System Independent (including OS) A single EDD for all hosts Robust Revision Control Testing and Registration International Standard Uniformity Supported by major suppliers Backward compatible Preserves investments Established – millions of devices worldwide System Independent (including OS) A single EDD for all hosts Robust Revision Control Testing and Registration International Standard Uniformity Supported by major suppliers Backward compatible Preserves investments

14 EDDL Cooperation Project Extension to the IEC 61804-2 International Standard Operating System & Communication Protocol Independent No Changes to Existing Device Descriptions Protects Investment in DD-based Devices, Tools & Training Single Technology for Suppliers and End Users Reduces Device Development Time & Development Cost Improves Asset Management Capability Extension to the IEC 61804-2 International Standard Operating System & Communication Protocol Independent No Changes to Existing Device Descriptions Protects Investment in DD-based Devices, Tools & Training Single Technology for Suppliers and End Users Reduces Device Development Time & Development Cost Improves Asset Management Capability

15 MOTOR SYMMETRY MOTOR PARAMETERS New EDDL Extensions Windows Dialog Boxes Grouping Paging Images Multiple Languages Enhanced Visualization

16 Blue line is a reference retrieved via FILE and ARRAY Travel (From device) Setpoint (Stored) New EDDL Extensions Plot real time device data. Valve Step Response Diagnostics Charts!

17 Radar Level Gauge Calibration Echo Curve Filter New EDDL Extensions Plot static device data, persisted data, calculated data, etc. Graphs

18 Blue line is a reference retrieved via FILE and ARRAY Open Stroke Close Stroke New EDDL Extensions Valve Signature Plot current and archived (persisted) data Graphs with persistent data

19 FF EDDL Products DD Services v5 for Host Applications DD Tokenizer v5 for Device Developers DD “Super” Viewer with full extension support (Development Support) Testing and Registration supported with Interoperability Test Kit (ITK) 5 (4Q2005) DD Services v5 for Host Applications DD Tokenizer v5 for Device Developers DD “Super” Viewer with full extension support (Development Support) Testing and Registration supported with Interoperability Test Kit (ITK) 5 (4Q2005)

20 EDDL Phase 2 Work is Underway Cooperation with OPC Support for UA (Universal Architecture) Platform independent Additional capabilities Better history support Improved flexibility Input to Fieldbus Foundation via End User Advisory Council EUAC@fieldbus.org Work is Underway Cooperation with OPC Support for UA (Universal Architecture) Platform independent Additional capabilities Better history support Improved flexibility Input to Fieldbus Foundation via End User Advisory Council EUAC@fieldbus.org


Download ppt "Fieldbus Roadmap NeSSI Workshop May 5, 2005 NeSSI Workshop May 5, 2005."