Download presentation
Presentation is loading. Please wait.
1
Office Design for LED Enterprises By Laverne E. Denyer ©Microsoft Office Suite
2
LED Enterprises Drafting and Design Business The business began in San Jose in 1973 and transferred to Yuba City in 1977. It is a sole-proprietor business. Formerly called Denyer’s Drafting & Design Or 3D Drafting ©Microsoft Office Suite
3
LED Enterprises Drafting and Design Business A primary business service is architectural designs for residential and commercial use.
4
LED Enterprises the Business, cont’d Target Clientele Business and Residential owners All ages and economic bases Contractors Additional space beyond office: None ©Microsoft Office Suite
5
Needs Assessment The primary needs for this business include: Computer space with adjacent work space Enough for two people Drafting board and equipment Enough for 2 people ©Microsoft Office Suite
6
Needs Assessment, cont’d Whiteprinter Copier Display Area General Work Area Accessibility
7
Needs Assessment, cont’d Drawing storage Supply and equipment storage Conference area File storage
8
Proposed Use Two person office Client conferences Designing, drawing and producing plans Design displays Business management
9
Business Marketing Strategy Low key – Primarily Referrals Local phone book Chamber of Commerce Other……
10
Design Elements Contemporary Style Interior and Exterior alike Excellent lighting and ventilation Computer safe (weather, static, power, etc.) Comfort Workability Aesthetics
11
Client Conference Notes Concerned about Space Minimum 1,000 square feet Budget $150,000 for furniture and equipment Facility development funds negotiable – approximately $275,000 Aesthetics
12
Considerations Sites and materials used for the development of this plan Codes to be met Other…..
13
Materials List Furniture: Equipment: Facility: Other Resources:
14
Cost Analysis Equipment & Furniture$100,000.00 Facility Cost$ 80,000.00 Design Fees$ 2,000.00 Total Cost$182,000.00
15
Comparative Research Plan “A” Square Feet…… Cost…….. Aesthetics…… Workability…… Desirability….. Plan “B” Square Feet…… Cost…….. Aesthetics…… Workability…… Desirability….. Recommendation: Select Plan “A”
16
Selected Plan: “A” ©LE Denyer 2000
17
Elevation ©LE Denyer 2000
18
Location ©LE Denyer 2000
19
Feasibility Report Plan “A” is very feasible because: Budget Design elements Workable Etc………..
20
Resources Works Cited Research Graphics Sounds Permissions
21
Design Report Design theories incorporated in this design Construction considerations Selection Rationale Structural Feasibility for Local Area Other………. ©Microsoft Office Suite
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.