24 May 2005C. Campagnari (UCSB)1 Status of Rod Production at UCSB This report covers the last week Reporting for: Dan Callahan Susanne Kyre Stephen Jaditz.

Similar presentations


Presentation on theme: "24 May 2005C. Campagnari (UCSB)1 Status of Rod Production at UCSB This report covers the last week Reporting for: Dan Callahan Susanne Kyre Stephen Jaditz."— Presentation transcript:

1 24 May 2005C. Campagnari (UCSB)1 Status of Rod Production at UCSB This report covers the last week Reporting for: Dan Callahan Susanne Kyre Stephen Jaditz Puneeth Kalavase Jim Lamb assembly testing

2 24 May 2005C. Campagnari (UCSB)2 Bottom Line Summary Rod production stopped since May 5 th pending resolution of I 2 C errors Much effort here and at FNAL trying to pinpoint the problem with assistance from CERN –Not much progress –Expect CERN experts "soon" Other progress: –chiller moved, loss of fluid problem seems fixed –continue work on cut tuning for bad channel flagging

3 24 May 2005C. Campagnari (UCSB)3 Summary of tests done at UCSB and FNAL


Download ppt "24 May 2005C. Campagnari (UCSB)1 Status of Rod Production at UCSB This report covers the last week Reporting for: Dan Callahan Susanne Kyre Stephen Jaditz."

Similar presentations


Ads by Google