Download presentation
Presentation is loading. Please wait.
1
Schedule
2
Team Notebook Grading Contents: meeting logs (date, time, duration, who is present, topics discussed, action items) graded assignments expenses (e.g., receipts) brainstorming (sketches, diagrams, outlines, etc.) Comments: meet at least once a week!!! don’t worry about correcting old notes
3
Timeline/Effort Matrix submit to Dr. Cahay in ERC 646 on Friday by 3pm report weekly activities leading to project demonstration and presentation in May 2005 be consistent with project description, diagrams, and all project documentation include tasks: –background research –component selection and/or design –testing and refining –documenting results –presentation and demo
4
System Requirements 1.Scope 2.Project Perspective 3.Project Functions 4.User Characteristics 5.Specific Requirements 6.Definitions, Acronyms and Abbreviations 7.References
5
System Requirements: Specific Requirements
6
Technical Specifications/Standards
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.