Update on DAQ Klaus Schossmaier CERN PH-AID ALICE TPC Meeting 21 April 2006
2
DAQ for TPC commissioning ALICE TPC meeting, 21 April 2006 2 DAQ setups for the TPC RCU Lab (epaitbeam02): 2 DDLs, 1 D-RORC, integration: RCU, SIU, Trigger, DATE, HLT, ECS SXL2 (pcald23): 1 DDL, 1 D-RORC, checks for installation, RORC utilities, LabView SXL2 (aldaqpc021): 1 DDL, 1 D-RORC, TPC electronics characterization, RORC utilities, LabView Hall 167 (pcalicetpc167): 2 DDLs, 1 D-RORC, TPC prototype with cosmics PX24/CR1 and SXL2 for commissioning 108 final SIUs have been given to Luciano Patch cords (14x 40m and 10x 60m E2000-LC) for SXL2 are available 2 Linux PCs for operating the DAQ/ECS have been placed in the clean room
3
DAQ for TPC commissioning ALICE TPC meeting, 21 April 2006 3 Planned DAQ Setup TDS LDC Event Building Network (Gigabit Ethernet) LDC 6x DRORC PX24/CR1 PC LDC DRORC HLT Farm PX24/CR2 RCU SIU SXL2 GDCServerGateway 2 TB Disk array (RAID 5) General Purpose Network (GPN) (DATE, ECS) (runControl) RCU SIU 6x DDL 6x
4
DAQ for TPC commissioning ALICE TPC meeting, 21 April 2006 4 Milestones !!! LHCC Milestones Combined TRG/DAQ/HLT with the TPC 450 (May06): running mode A+B 451 (Jun06): running mode A+B+C Work to be done Maintaining the DAQ setups Continuing the installations of machinery in CR1 DATE v5.15 installation/configuration ECS v2.7 installation/configuration Integration DAQ/Trigger/HLT/ECS Implementation of the different calibration runs Participation in data quality monitoring (MOOD) Participation in the RCU configuration via DDL Scheme to capture RCU DDL equipmentId
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.