Preliminary Design Review Week 6 Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Thursday March 13, 2008.

Similar presentations


Presentation on theme: "Preliminary Design Review Week 6 Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Thursday March 13, 2008."— Presentation transcript:

1 Preliminary Design Review Week 6 Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Thursday March 13, 2008

2 1. Continue Interface with Microcontroller - GPS System - Motors 2. Build First Generation Prototype - Build to-scale model - Create a Mast and Boom similar to the one that will be used on final prototype Previous Week’s Action Items

3 Previous Week’s Action Item #2 Construct First Generation Prototype

4 Prototype Highlights -Body built using plywood -Mast and boom built out of 1.5” diameter PVC -Width = 18” -Length = 24” -Total Weight = 12.66 lb -Total Weight if Built Using HDPE = 37.98 lb Construct First Generation Prototype Previous Week’s Action Item #2

5 Current Status of Concept Second Generation CAD Model Key Features: - Rear Driven Wheels/Front Casters - PVC Boom with Infrared Sensors - HDPE Body -GPS Navigation System Currently On Schedule No Showstoppers

6 Second Generation CAD Model

7 Next Week’s Action Items 1.Begin Building Boom and Mast for Final Prototype -Build using PVC acquired from Loews -Specs for the Design Height = 30” Width = 12” 2. Order Components for Drive System -Wheels and Casters have been acquired -Motor, Drive Shafts, and Ball Bearings will be chosen and purchased.

8 Next Week’s Action Item #2 Motors -Two Motors that will Power the Rear Wheels -Motor Specs: ω = 225 rpm T = 1 N-m Drive Shaft and Ball Bearings -Drive Shaft will be chosen once it has been decided how to connect wheels and motor output. -Ball Bearings will be chosen based on Drive Shaft Diameter. -Pillow Block Bearings will most likely be used.

9 Questions???