Meet the Team Aaron Heyman 5 th Year Industrial Engineer Team Lead Adam Cook 5 th Year Industrial Engineer Jose Rodriguez 5 th Year Industrial Engineer Abraham Taleb 4 th Year Industrial Engineer Sarah Pittman CooperVision Process Improvement Manager RIT Class of 1997
2
Project Description World's Second leading Producer of Contact Lenses 250,000 Sq Ft. Distribution Center in Henrietta Determine the Current Capacity of Distribution Center Distribution Capacity Analysis for CooperVision Provide a Computer Based Tool to help Determine Capacity Provide CooperVision with Process Improvements Focus will be on the Picking and Packing Areas
3
Deliverables Status Needs Assessment – Partially Complete Need second visit to customer site Project Overview – Complete 1 Page Summary – Complete Work Breakdown Structure – Complete 2 Quarter Schedule – Complete Team Values and Norms – Complete
4
Key Challenges Time at customer site will be limited CooperVision works with a highly fluctuating demand High number of Stock-Keeping Units (SKUs) Looking at the middle of the system makes it difficult to create pull (optimizing part, not whole) The need to make large assumptions Potential expansion in the scope of the project by customer
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.