Presentation is loading. Please wait.

Presentation is loading. Please wait.

Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 3 November 2003 Sam Burke Lance Simms.

Similar presentations


Presentation on theme: "Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 3 November 2003 Sam Burke Lance Simms."— Presentation transcript:

1 Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 3 November 2003 Sam Burke Lance Simms UCSB HEP Group

2 Slide 2UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Progress Requested Collie Box and Peltier Power Supply from CERN for FermiLab Cold Box à Giacomo & Bruno (no response) NIM Crate, LeCroy modules and 19” Rack requested from FermiLab à Lenny Purchase Orders issued for System parts. à Valves, Transducers, Relays, T/E Element à $1500

3 Slide 3UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Progress Copper Buss bars currently being installed in refurbished Cold Box à Used to reduce noise levels for ARC Test System New low mass Thermal Transfer Plate fabricated, currently in assembly process. à Reduced thermal cycle time expected Reduce Antenna clearance to Pitch Adapters

4 Slide 4UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE Future Plans Complete Refurbishment of First Cold Chamber and test performace Work on assembly work for FermiLab Cold Box System Order remaining parts for FermiLab unit.


Download ppt "Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 3 November 2003 Sam Burke Lance Simms."

Similar presentations


Ads by Google