Download presentation
Presentation is loading. Please wait.
1
E cm up to 1 TeV, de- pending on site chosen Design luminosity of 2x10 34 cm -2 s -1 Beam spot: 550x5.7 nm Crossings every 337 ns for about 1 s; repeats at 5 Hz TESLA NLC
2
Linear Collider Detectors (approximate) “L” Design: Gaseous Tracking (TPC) R max ~ 170cm 4 Tesla Field Precise (Si/W) EM Calorimeter “S” Design: Solid-State Tracking R max = 125cm 5 Tesla Field Precise (Si/W) Calorimeter
3
The SD-MAR01 Tracker B=4T B=5T The Trackers Gaseous (LD, LDC, …) Solid-State (SD, SiD, …)
4
… and Their Performance Error in radius of curvature is propor- tional to error in 1/p , or p /p 2. Code: http://www.slac.stanford.edu/~schumm/lcdtrk.tar.gz This is very rough; details and updates in a moment!
5
Linear Collider Physics… At leading order, the LC is a machine geared toward the elucidation of Electroweak symmetry breaking. Need to concentrate on: Precision Higgs Physics Strong WW Scattering SUSY
6
Reconstructing Higgsstrahlung ++ -- Haijun Yang, Michigan M for p / p 2 = 2x10 -5
7
Potential Advantages of the Gossamer Tracker Such a tracker may prove mechanically simpler, and offers the greatest possibility of competing with gaseous tracking at low p . Substantial work needed in fleshing out design; we will expand our discus- sion at SCIPP soon; can use much help!
8
FPGA-based control and data- acquisition system INITIAL RESULTS LSTFE-2 chip mounted on readout board
9
CDF L00 Sensor “Snake” CDF L00 “Snake” LSTFE1 chip on Readout Board
10
Readout Noise Results Relative to prior results, have explored “center- tapping” (reading out from center of chain rather than end. Naïve expectation Expectation with measured shape factors F i, F v Measured (end readout) Measured (center-tap)
11
11 Damage coefficients less for p-type for E e- < ~1GeV (two groups); note critical energy in W is ~10 MeV But: Are electrons the entire picture? NIELe - Energy 2x10 -2 0.5 MeV 5x10 -2 2 MeV 1x10 -1 10 MeV 2x10 -1 200 MeV G.P. Summers et al., IEEE Trans Nucl Sci 40, 1372 (1993)
12
Proposal: JLAB Hall B Beam Dump (Plan to run 0.05 A through next May) Total power in beam ~250W.
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.