P. Emma, SLACLCLS FAC Meeting - April 29, 2004 Linac Physics, Diagnostics, and Commissioning Strategy P. Emma LCLS FAC Meeting April 29, 2004 LCLS
2
P. Emma, SLACLCLS FAC Meeting - April 29, 2004 Nominal LCLS Linac Parameters for 1.5-Å FEL Single bunch, 1-nC charge, 1.2- m slice emittance, 120-Hz repetition rate… (RF phase: rf = 0 is at accelerating crest) SLAC linac tunnel research yard Linac-0 L =6 m Linac-1 L 9 m rf 25° Linac-2 L 330 m rf 41° Linac-3 L 550 m rf 10° BC-1 L 6 m R 56 39 mm BC-2 L 22 m R 56 25 mm LTU L =275 m R 56 0 DL-1 L 12 m R 56 0 undulator L =130 m 6 MeV z 0.83 mm 0.05 % 135 MeV z 0.83 mm 0.10 % 250 MeV z 0.19 mm 1.6 % 4.54 GeV z 0.022 mm 0.71 % 14.1 GeV z 0.022 mm 0.01 %...existing linac new rfgun 21-1b21-1d X Linac-X L =0.6 m rf = 21-3b24-6d25-1a30-8c
3
P. Emma, SLACLCLS FAC Meeting - April 29, 2004 Complete & Detailed Design (cathode to dump) BC2LTU undulator L3 L2 cathode
4
P. Emma, SLACLCLS FAC Meeting - April 29, 2004 Machine Flexibility Operation at 0.2 to 1.0 nC and constant 87-m saturation length at 1.5 Å in/output beam linac setup jitter
5
P. Emma, SLACLCLS FAC Meeting - April 29, 2004 RMS Bunch Length and Energy Spread sector-21sector-25sector-30FFTB++ zzzz
6
P. Emma, SLACLCLS FAC Meeting - April 29, 2004 after BC1 after X-RF after L1 after DL1 after BC2 after L3 at und. after L2 z = 830 m z = 190 m z = 23 m z = 190 m energy profile phase space time profile (2002 example)
7
P. Emma, SLACLCLS FAC Meeting - April 29, 2004 Location of Main Linac Diagnostics 5+ energy spread meas. stations (optimized with small )...existing linac L0 rfgun L3L1 X L2 x,y EEEE EEEE EEEE EEEE 5+ emittance meas. stations designed into optics ( x,y ) slice measurements possible with transverse RF (L0 & L3) BPMs at or near most quadrupoles and in each bend syst. RF deflectors for slice and E measurements EEEE EEEE EEEE EEEE EEEE EEEE T-cav. T-cav. x,y ?
8
P. Emma, SLACLCLS FAC Meeting - April 29, 2004 Linac ‘Commissioning’ (Physics) How to setup I pk = 3.4 kA, 1.2 m, etc. What to measure and what to adjust Simulations Longitudinal phase space Bunch Length Energy Spread (proj. & slice) Transverse phase space Projected Emittance Slice Emittance Will show a few examples, not full plan
9
P. Emma, SLACLCLS FAC Meeting - April 29, 2004 Setup of Linac-0 RF Approximate injector parameters needed prior to linac commissioning. RF-deflector at 1 MV Phasing L0-Linac RF-deflector y bunch length minimize energy spread with L0 RF phase
10
P. Emma, SLACLCLS FAC Meeting - April 29, 2004 Setup of Linac-1 RF Linac-1 RF phase scan (X-band off, BC1 bends at 295 MeV) Linac-X RF phase scan (BC1 bends at 250 MeV) set phase to 25˚ 0.5˚ set phase to 160˚ 0.5˚ 20- m res. BC1 BPM L1 RF phase LX RF phase Turn on BC1 energy feedback Switch off BC2 chicane Use sec-25 RF-deflector to meas. bunch length ( z1 ) Adjust S-band RF phase ( 0.5˚) to set z1 195 10 m Linac-1 new rfgun 21-1b21-1d X
11
P. Emma, SLACLCLS FAC Meeting - April 29, 2004 Verify BC1 Setup with Wake-Loss Scan Scan Linac-1 S-band RF phase and use BC2 BPM to find maximum wake-induced energy loss across Linac-2 rfgun L1 X L2 (NO CSR) well tested at SPPS
12
P. Emma, SLACLCLS FAC Meeting - April 29, 2004 Setup of Linac-2 RF Linac-2 RF phase scan (BC2 bends at 5.9 GeV, or…) set phase to 41˚ 0.5˚ 40- m res. BC2 BPM L2 RF phase Turn on BC2 energy feedback Use sec-25 RF-deflector to measure length ( z2 ) Adjust L2 RF phase ( 0.5˚) to set z2 20 2 m Linac-3 phasing is trivial ( 5˚) 5- m res. LTU BPM L2 phase Scan Linac-2 phase & use LTU BPM to find max. wake-induced energy loss across Linac-3 (NO CSR) L2L3
13
P. Emma, SLACLCLS FAC Meeting - April 29, 2004 RMS Transverse Beam Sizes: Cathode to Dump 100 m 10 m 1 mm undulator 4.0 mm (BC1) 2.6 mm (BC2)
14
P. Emma, SLACLCLS FAC Meeting - April 29, 2004 Emittance Meas. Simulation in LCLS OTR1,2,3WS11,12,13 BC1 Multiple OTR screens Multiple wire-scanners Quad-scans on single OTR Quad-scans on OTR with RF-deflector
15
P. Emma, SLACLCLS FAC Meeting - April 29, 2004 135-MeV OTR x -profiles from tracking x = 0.75 ± 0.04 m x 118 m x 49 m x 120 m non-Gaussian
16
P. Emma, SLACLCLS FAC Meeting - April 29, 2004 Slice-Emittance Measurement Simulation RF-deflector at 1 MV slice OTR 10 times y bunch length quad scanned
17
P. Emma, SLACLCLS FAC Meeting - April 29, 2004 Slice-Emittance Measurement Simulation slice-5 Injector at 135 MeV with S-band RF-deflector at 1 MV = meas. sim. = calc. = y distribution = actual (same SLAC slice- code used at BNL/SDL) (slice- y -emittance also simulated in BC1-center)
18
P. Emma, SLACLCLS FAC Meeting - April 29, 2004 Empirical BC1/BC2 Dispersion Correction Residual x -dispersion (and its angle) is precision minimized using ‘tweaker’ quads in the chicane actual data from SPPS chicane x /2 SPPS chicane with quads Correct and ( ), orthogonally with 2 quads
19
P. Emma, SLACLCLS FAC Meeting - April 29, 2004 Moveable Chicanes BPM screen collimator quadrupole BPM critical for energy feedback (20 m resolution) offset: 0 to 32 cm (24 cm nominal) 3 cm contraction BPM screen collimator
20
P. Emma, SLACLCLS FAC Meeting - April 29, 2004 Field quality requirement too tight with fixed chicane... SPPS dipoles: |b 2 /b 0 | < 0.010% @ 2 cm (just barely met) |b 2 /b 0 | < 0.002% @ r = 2 cm requires: |b 2 /b 0 | < 0.002% @ r = 2 cm (moveable chicane requires 0.070%) Also needed: BPM res. 20 mBPM res. 20 m BPM linearityBPM linearity profile monitorprofile monitor collimatorcollimator straight-through operationsstraight-through operations x 12 mm 45 mm 80 mm
21
P. Emma, SLACLCLS FAC Meeting - April 29, 2004 Linac-To-Undulator (LTU) 4 -wires, 6 collimators, 1 OTR energy centroid & spread meas. (OTR) (3 10 5 & 10 4 ) + collimation vertical bends vertical bend 4.7 mr horizontal jog 1.25 m energy diagnostics emit. diagnostics bunch length diag. collimators CSR cancellation branch points for future undulators spontaneous undulator possible vertical bend 4.7 mr horizontal jog 1.25 m energy diagnostics emit. diagnostics bunch length diag. collimators CSR cancellation branch points for future undulators spontaneous undulator possible
22
P. Emma, SLACLCLS FAC Meeting - April 29, 2004 Slice-Emittance Configuration for LTU slice-emit. meas. optics OTR33 nominal optics (proj. emit.) WS31-34 undulator… stopperinserted
23
P. Emma, SLACLCLS FAC Meeting - April 29, 2004 Slice-Emittance Measurements in LTU = meas. sim. = calc. = y distribution = actualx x z y LTU at 14 GeV with S-band RF-deflector at 24 MV
24
P. Emma, SLACLCLS FAC Meeting - April 29, 2004 Slice Energy Spread Measurements in LTU LTU at 14 GeV with S-band RF-deflector at 24 MV FEL goal E /E E /E 10 4 x 12 m
25
P. Emma, SLACLCLS FAC Meeting - April 29, 2004 Summary LCLS linac is operationally flexible Diagnostics have been incorporated into optical design and simulated (1 st pass) Two RF-deflectors allow time resolved measurements at low and high energy Tune-up algorithms have been considered, but more refinement is needed Feedback systems must maintain setup while tuning progresses