Download presentation
Presentation is loading. Please wait.
1
3/29/06Michael Dixon1 CE 578 Highway Traffic Operations Lecture 28: Ramp Metering
2
3/29/06Michael Dixon2 Objectives Terminology Objectives and types of ramp metering Local ramp metering Coordinated ramp metering
3
3/29/06Michael Dixon3 Terminology Meter rate Allowable metering rate –MAX = 720 to 900 veh/hr –MIN = 180 to 240 veh/hr Vehicles per cycle (usually posted at meter)
4
3/29/06Michael Dixon4 Ramp Metering Objectives and Types Local or coordinated Platoon-breakup Gap-acceptance Demand-capacity
5
3/29/06Michael Dixon5 Local Ramp Metering—Platoon- Breakup
6
3/29/06Michael Dixon6 Local Ramp Metering—Gap- Acceptance upstream gap detector detected gap vehicle released for gap
7
3/29/06Michael Dixon7 Local Ramp Metering—Demand- Capacity mainline detector used to determine metering rate detected volume = 4800 vph Design capacity = 5400 vph Metered ramp upstream of potential bottleneck Allowed volume = 600 vph Meter rate of 600 vph or 6.0 seconds per vehicle.
8
3/29/06Michael Dixon8 Coordinated Ramp Metering— Demand-Capacity General objective function
9
3/29/06Michael Dixon9 Coordinated Ramp Metering— Demand-Capacity
10
3/29/06Michael Dixon10 Coordinated Ramp Metering— Demand-Capacity
11
3/29/06Michael Dixon11 Coordinated Ramp Metering— Demand-Capacity Setting meter rates
12
3/29/06Michael Dixon12 Coordinated Ramp Metering— Demand-Capacity Choosing the next ramp to meter
13
3/29/06Michael Dixon13 Coordinated Ramp Metering— Demand-Capacity bottleneck 12233445
14
3/29/06Michael Dixon14 Coordinated Ramp Metering— Demand-Capacity Equation objective Second term Third term
15
3/29/06Michael Dixon15 Coordinated Ramp Metering— Demand-Capacity
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.