1 Subsystem Reviews Reviews this week: RFCC modules RF Power Infrastructure MICE Infrastructure LH2 system
2
2 Observations & Actions RFCC module: In very good shape – in strong position for manufacture of cavities and vac-vessel Need to make sure that all cooling channel elements have common tolerance and dimension pattern for flange hole PCDs – Wing to organise RF Power Infrastructure Andy Moss will prepare plan of the system configuration within one month for approval within MICE, then submit to external experts for comment RAL team must start to look at integrating amplifiers and stuff at RAL - action Tim
3
Observations & actions MICE Infrastructure –Hadn’t taken place before I wrote this! LH2 system –I believe our biggest worry: –R&D hardware has been stalled for > six months –Mike & Matt to intervene urgently with AS Scientific and RAL contracts –Indecision over control system philosophy has clearly stalled HAZOP review schedule –So yet more meetings to address the above –Really have to make sure the right people attend –Real problem here is inability to work in parallel with Decay solenoid and FC projects 3
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.