Download presentation
Presentation is loading. Please wait.
1
CM23 Harbin January 2009TOF Reconstruction1 TOF reconstruction Mark Rayner CM23 Harbin
2
CM23 Harbin January 2009TOF Reconstruction2 G4MICEReconstructionG4MICEAnalysisTools Real Data G4MICESimulation TofSlabHits TofSpacePoints TofDigits Analysis Applications TofTrack MICE data KEK data Simulation Digitization Time and signal in each PMT Hit time in scintillator slabs Muon time and position in each TOF Average muon momentum between TOFs GVA data 2m.rayner1@physics.ox.ac.uk TofRec at a glance
3
CM23 Harbin January 2009TOF Reconstruction3 New applications ●New applications in development (but already useful!): ■TofMonitor ►Space point/time-of-flight/momentum reconstruction at a glance ►Are all the PMTs broken and how/correctly cabled? ■TofCalibration ►Calibrating the TOFs for cable length and testing this calibration ►Plane-plane time-walk and station-station calibration in development ■TofEmittance ►Plot x-x’ and y-y’ trace space ►Calculate emittance ●These are uploaded to G4MICE and easy to use ■Histograms automatically thrown to the screen and fill up as you run ■How to run them ►./Executable cards.in datafiles ►./TofCalibration cards.in 885.000 ►./TofMonitor cards.in Digits.out.gz ►./TofEmittance cards.in 8{79..81}*
4
CM23 Harbin January 2009TOF Reconstruction4 New datacards ●Old required datacards: ■Model ►New more accurate models required though! ●New datacards: ■TofCalibrationMode ►0 – Use existing calibration, and reconstruction cuts ►1 – Disregard calibration (in order to make a new one) and disregard reconstruction cuts ■FileTag ►String to include in the various root/text/picture output files
5
CM23 Harbin January 2009TOF Reconstruction5 TofMonitor application Left PMT’s TofDigit Right PMT’s TofDigit TofSlabHit’s TofSpacePoint’s
6
CM23 Harbin January 2009TOF Reconstruction6 TofMonitor application
7
CM23 Harbin January 2009TOF Reconstruction7 TofCalibration application
8
CM23 Harbin January 2009TOF Reconstruction8 TofCalibration application
9
CM23 Harbin January 2009TOF Reconstruction9 TofCalibration application
10
CM23 Harbin January 2009TOF Reconstruction10 TofCalibration application
11
CM23 Harbin January 2009TOF Reconstruction11 TofEmittance application TOF0 x (mm) TOF1 x (mm)TOF1 y (mm) TOF0 y (mm) TOF0 dx/dz TOF1 dx/dz TOF1 dy/dz TOF0 dy/dz
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.