Team S.H.I.E.L.D Launch Readiness Review Team Members Evan Coffey Aaron Holt Travis Pollok Matthew Ross Jared Turner Addison Woodward-Parrish 11/11/08.

Similar presentations


Presentation on theme: "Team S.H.I.E.L.D Launch Readiness Review Team Members Evan Coffey Aaron Holt Travis Pollok Matthew Ross Jared Turner Addison Woodward-Parrish 11/11/08."— Presentation transcript:

1 Team S.H.I.E.L.D Launch Readiness Review Team Members Evan Coffey Aaron Holt Travis Pollok Matthew Ross Jared Turner Addison Woodward-Parrish 11/11/08

2 To See the Stars Mission Overview –Using a CCD Imager, Team S.H.I.E.L.D shall record video of the flight during the Ascent and Descent in Order to show Stars becoming visible at High Altitudes.

3 The Legendary Dodecahedron Design Overview

4 Early Layout After Cold Test

5 Cold Test

6 Whip Test Drop Test

7 Stair Test

8 All Systems go?

9 Pending Total Failure… We Expect… Altitudes determination –We expect to show that at a height of roughly 11 km the Stars start to become more and more visible (increasing visibility at higher altitudes)

10 I aint Afraid of No Ghosts… Lens Issues (not Focused Properly) Power Failure Pressure Readings (Measurement Error)

11 Enter the Matrix RequirementMet?How? / Why? Allows for Cannon Camera Cannon Camera integrated and used to take pictures No more than 1000 grams Overweight by ~200 g Integrated Flight StringFlight String is integrated through the center of the design Internal Temperature remains above 0 C Included Heater, and tested toughly BalloonSat Structure made of Foam Core Used Foam Core as primary Material American Flag IncludedIncluded on Outside of the BalloonSat