1
© 2006 Atomic Ninja Design Atomic Ninja Design Presents Advanced Air Vehicles Ted House Veng Lee Jamison Bloechl
2
© 2006 Atomic Ninja Design Introduction Site Map Graphical Prototypes Technology and Tools used - Development - Deploying and Maintaining Phases
3
© 2006 Atomic Ninja Design Site Map Link to Site MapSite Map or here http://www.ecst.csuchico.edu/~venglee/WebPageDesignFall06/SiteMap/technicialFlowChart.htm
4
© 2006 Atomic Ninja Design Prototype Button link Button link
5
© 2006 Atomic Ninja Design Technology and Tools Popular Browser to test Site - IE - Firefox - Avant - Mozilla Notepad Microsoft Word and FrontPage Photoshop CS2 Mirage Digital Camera
6
© 2006 Atomic Ninja Design Project Phases Phase #1: Started October 9, 2006 Task: -Assess needs of the client to jump start the project. Discuss within group the best means of meeting the client’s needs (All members will attend the meeting) -Complete technical presentation, site map, and prototype home page Phase #1 Status: Completed 10/26/06 Phase #2: October 27, 2006 to October 30, 2006 Task: -Ted will do additional research on client for additional content. Jamison and Veng will audit the content researched. -Veng and Jamison will Photoshop/mirage different layouts for potential website themes, logos, and other graphical items. -All group members will gather ideas on possible navigation/maintenance
7
© 2006 Atomic Ninja Design Phases cont… Phase #3: October 31, 2006 to November 3, 2006 -Continue researching and editing content -Picked possible layout and feel of entire website Task: -Progress report 1 -Meet with members to agree on the additional content (all members will attend the meeting). -All three will work on coding and layout of website. (all member will contribute idea) -Assign members task for the weekend work: Coding (all members), contents (Ted) and graphics (Jamison and Veng). -Meet at the end of the phase to report progress of task
8
© 2006 Atomic Ninja Design Phases cont… Phase #4: November 3, 2006 to November 10, 2006 -Early stage of website. Task: -Auditing on assigned tasks -Assign members task for next meeting. Coding(all members), contents (Ted) and graphics (Jamison and Veng). -meet at the end of the phase to report progress of task Phase #5: November 10, 2006 to November 17 -Near completed stage of Website Task: -Progress report 2 -Auditing on assigned tasks -Meet at the end of phase to finalize project
9
© 2006 Atomic Ninja Design Phases cont… Phase #6: November 18, 2006-December 6, 2006 Presentation to class Completed: -Members will test out website with different browsers -Affirm that all needs assessed from Phase 1 have been met -Audit/recoding to finalize Website debugging content and code -Final Live Website -Final presentation to class
10
© 2006 Atomic Ninja Design Team Dynamics Team communication -E-mail -Phone -Weekly Meetings and progress reports -Instant Messenger Division of team tasks - Refer to phases
11
© 2006 Atomic Ninja Design Conclusion Site map (content) is not finalized and will be going through adjustment from research Further improve homepage/prototype design through maintenance and debugging. Task and deadline is set and on schedule Thanks for your attendance