Presentation is loading. Please wait.

Presentation is loading. Please wait.

EDEP UG Bretigny, June 9 th 2008 eDEP Users Group Meeting Radar Skills Trainer Road map Vladimir Bubalo, IANS TDH.

Similar presentations


Presentation on theme: "EDEP UG Bretigny, June 9 th 2008 eDEP Users Group Meeting Radar Skills Trainer Road map Vladimir Bubalo, IANS TDH."— Presentation transcript:

1 eDEP UG Bretigny, June 9 th 2008 eDEP Users Group Meeting Radar Skills Trainer Road map Vladimir Bubalo, IANS TDH

2 eDEPUG Bretigny, June 9 th 2008 RST History RST in brief Future steps Content RST users Support & Maintenance

3 eDEPUG Bretigny, June 9 th 2008 RST History V1.0 replacement was necessary obsolete software 199920002001200220032004200520062007 V 1.0 V 2.1V 2.0 TTT Austrocontrol NATS Belgocontrol RST UG TFG16 V2 - Phased development Intensive live testing Improve V1

4 eDEPUG Bretigny, June 9 th 2008 RST in brief Progress review Airspace Weather Radar Skills Trainer EPTEPT Exercise Preparation Tool Flights Users Classes Courses Replay Analyses R/T eDEP Lightweight, Java-based PTT Automatic objective measurement Replay

5 eDEPUG Bretigny, June 9 th 2008 RST Configuration STANDALONE Hybrid Distributed Local Network – No Course Management System Local Network - CMS

6 eDEPUG Bretigny, June 9 th 2008 RST Configuration: standalone - 1PC Hybrid Standalone

7 eDEPUG Bretigny, June 9 th 2008 RST Configuration: distributed - 2 PCs RST software Pilot Network connection No CMS Controller PWP software

8 eDEPUG Bretigny, June 9 th 2008 CMS SERVER Network connection Pilot (PWP) RST software Controller (CWP) RST Configuration: CMS server

9 eDEPUG Bretigny, June 9 th 2008 What may be measured?

10 eDEPUG Bretigny, June 9 th 2008 Users FI GE AM AZ EE UA MD TR CY FR LV LT BE NL DE GB IE BY RO AL BG GR CH IT AT HU RS ES PT DK NO SE PL CZ MT MA DZ TN KZ RU LU SK SI HR MC BH MK CG 13 RST Users 5 LAs in preparation http://elearning.ians.lu/ptt/

11 eDEPUG Bretigny, June 9 th 2008 Support & Maintenance Maintenance agreement (TDH – Graffica) 1 st level - On line help DESK Each authorised user – support account Response within two (working) days On site CMS installation on request (Graffica) Mission expenses covered by user Local IT support to assist installation Similar service offered by Austrocontrol

12 eDEPUG Bretigny, June 9 th 2008 Future steps 20082009 JanFebMarApr May JunJulAugSepOctNovDecJanFebMarApr eDEP coordination RST Users group Oct 2008 V2.3 development Improved V2.2 release eDEP UG

13 eDEPUG Bretigny, June 9 th 2008 Future steps Change Request Description Component(s) affected Effort Required (days) Cross Over the Point EPT, SIM, Replay5 PWP Aircraft PerformanceEPT, SIM7 Route Visibility EPT, SIM, Replay5 Range and Bearing ValuesEPT, SIM1.5 Mode N (Primary only targets) EPT, SIM, Replay5 Transponder Failure EPT, SIM, Replay7 CMS record all resultsCMS7 EPT map resource configuration and preview functionality EPT4 Specify holding fixes and scoring of related tasksEPT, SIM5 Prediction Vector selectable by studentsEPT, SIM2 Improved Radar picture at PWPPWP3 Express range and bearing tolerances in percentagesEPT, SIM1 Exercise clock for pilotPWP1 Extra notification when PWP is available but not visible SIM1 V 2.3 improvements

14 eDEPUG Bretigny, June 9 th 2008 Future steps eDEP LARA CIMACT TWR ITWP FASTI TCAS RST AVT

15 eDEPUG Bretigny, June 9 th 2008 Future steps better coordination shared software changes reduced overall costs guaranteed and improved maintenance increased workload dependence on the core platform for software releases Benefits Disadvantages 

16 eDEP UG Bretigny, June 9 th 2008


Download ppt "EDEP UG Bretigny, June 9 th 2008 eDEP Users Group Meeting Radar Skills Trainer Road map Vladimir Bubalo, IANS TDH."

Similar presentations


Ads by Google