Presentation is loading. Please wait.

Presentation is loading. Please wait.

SVACInstrument Analysis Meeting, August 5, 2005 Anders W. Borgland 1 Announcements Anders W. Borgland Science Verification, Analysis and Calibrations.

Similar presentations


Presentation on theme: "SVACInstrument Analysis Meeting, August 5, 2005 Anders W. Borgland 1 Announcements Anders W. Borgland Science Verification, Analysis and Calibrations."— Presentation transcript:

1 SVACInstrument Analysis Meeting, August 5, 2005 Anders W. Borgland 1 Announcements Anders W. Borgland Science Verification, Analysis and Calibrations

2 SVACInstrument Analysis Meeting, August 5, 2005 Anders W. Borgland 2 From 6 towers to 8 Towers to 8 Towers+ACD Installing towers 7 and 8 right now: –Grid positions 12 and 13 8 tower testing: –Starts next week CAL calibrations: –Scheduled for August 16-18 –Subject to change.... Calibrations will now be done in parallel: –Will (re)calibrate all 8 CALs. –Previously we only calibrated the two new CALs. –Zach is making sure calibGenCAL can handle the parallelization SVAC Data runs: –Scheduled for August 18-23 –Subject to change.... ACD arrives at SLAC in the middle of August! –What kind of runs do we want to take? –Need to start preparing now!

3 SVACInstrument Analysis Meeting, August 5, 2005 Anders W. Borgland 3 Workshop 5 Workshop 5 is only 3 weeks away!


Download ppt "SVACInstrument Analysis Meeting, August 5, 2005 Anders W. Borgland 1 Announcements Anders W. Borgland Science Verification, Analysis and Calibrations."

Similar presentations


Ads by Google