Download presentation
Presentation is loading. Please wait.
2
The Team Alex Estey - MEAlex Estey - ME Kenn Austin - CSKenn Austin - CS Matt Clark - MEMatt Clark - ME Tristan Schneiter - CSTristan Schneiter - CS Yago Alanso Garcia – EEYago Alanso Garcia – EE Jeff Frolik - AdvisorJeff Frolik - Advisor Norm Baldwin – Assistant Director of BDPWNorm Baldwin – Assistant Director of BDPW
3
The Customer City of Burlington Department of Public WorksCity of Burlington Department of Public Works Responsible for 240 road lane milesResponsible for 240 road lane miles Responsible for 120 miles of sidewalkResponsible for 120 miles of sidewalk 3 baseline snow fighting plans3 baseline snow fighting plans –2 inches or less –2-6 inches –6+ inches 7 trucks plowing six areas at any time7 trucks plowing six areas at any time
5
Goals of Project TrackTrack –Plow up, plow down –Road temp –lbs salt / mile –Truck speed –Where trucks have been User InterfaceUser Interface –Displays tracked data –Two versions One for internal useOne for internal use One for public useOne for public use
6
GPSUser InterfaceSensorsEnclosures Radio DatabaseUser Interface Vehicle Base Yago- GPS and Radio Matt- Sensors Tristan-User Interface (vehicle and base) Alex- Enclosures Database Kenn- User interface (vehicle and Base) Assignments The System
7
Contacts and Updates Email: UVMBPWD@list.uvm.edu http://www.cems.uvm.edu/~tschneit/bdpw
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.