Download presentation
Presentation is loading. Please wait.
1
GLAST LAT Instrument GLAST Monthly Mission Review October 5, 2007 K. Fouts, SLAC 1 Monthly Mission Review Project Status Overview October 5, 2007 Ken Fouts SLAC kfouts@slac.stanford.edu Gamma-ray Large Area Space Telescope
2
GLAST LAT Instrument GLAST Monthly Mission Review October 5, 2007 K. Fouts, SLAC 2 LAT Accomplishments ActivityDate LAT Radiator Flight Integration and Test Complete8/11 LAT closeouts for dynamics test8/24 LAT review of Observatory Lift Procedure and VLF8/29 Supported Lifts for Modal Survey9/8 Supported Z axis vibe9/18 Aliveness Tests9/20 Supported Vibe test completion9/22 Aliveness Tests9/23 PAF fitcheck9/26
3
GLAST LAT Instrument GLAST Monthly Mission Review October 5, 2007 K. Fouts, SLAC 3 LAT Planned Milestones ActivityECD LAT FSW B1-0-210/24 Mission Sim Training (MOC)10/24 Launch Ops Working Group Meeting10/24 Post Dynamics CPT10/27
4
GLAST LAT Instrument GLAST Monthly Mission Review October 5, 2007 K. Fouts, SLAC 4 LAT Issues and Concerns Integration of new Solaris compiler Primary and redundant VCHP Heater voltage sum swapped on spacecraft B side. SC database fix proposed Command & Data Dropouts
5
GLAST LAT Instrument GLAST Monthly Mission Review October 5, 2007 K. Fouts, SLAC 5 Cost Reports for 4.1 LAT August 2007 Month End Gamma-ray Large Area Space Telescope
6
GLAST LAT Instrument GLAST Monthly Mission Review October 5, 2007 K. Fouts, SLAC 6 Cost Status by Organization
7
GLAST LAT Instrument GLAST Monthly Mission Review October 5, 2007 K. Fouts, SLAC 7 Manpower Report
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.