MT 2351 Chapter 5 Transportation, Assignment, and Transshipment
2
MT 2352 Network Flow Problems Transportation Assignment Transshipment Production and Inventory
3
MT 2353 Network Flow Problems - Transportation Building Brick Company (BBC) manufactures bricks. One of BBC’s main concerns is transportation costs which are a very significant percentage of total costs. BBC has orders for 80 tons of bricks at three suburban locations as follows: NNorthwood – 25 tons WWestwood – 45 tons EEastwood – 10 tons BBC has two plants, each of which can produce 50 tons per week. BBC would like to minimize transportation costs. How should end of week shipments be made to fill the above orders given the following delivery cost per ton? $/tonNorthwoodWestwoodEastwood Plant 1243040 Plan 2304042
4
MT 2354 Network Representation - BBC 1 Northwood 2 Westwood 3 Eastwood 1 Plant 1 2 Plant 2 50 25 45 10 Plants (Origin Nodes) DestinationsTransportation Cost per Unit Distribution Routes - arcsDemandSupply $24 $30 $40 $30 $40 $42
5
MT 2355 Define Variables - BBC Let: x ij = # of units shipped from Plant i to Destination j
6
MT 2356 General Form - BBC Min 24x 11 +30x 12 +40x 13 +30x 21 +40x 22 +42x 23 s.t. x 11 +x 12 +x 13 <= 50 x 21 +x 22 + x 23 <= 50 x 11 + x 21 = 25 x 12 + x 22 = 45 x 13 + x 23 = 10 x ij >= 0 for i = 1, 2 and j = 1, 2, 3 Plant 1 Supply Plant 2 Supply North Demand West Demand East Demand
7
MT 2357
8
8
9
9
10
10
11
MT 23511 Network Flow Problems Transportation Problem Variations TTotal supply not equal to total demand Total supply greater than or equal to total demand Total supply less than or equal to total demand MMaximization/ minimization Change from max to min or vice versa RRoute capacities or route minimums UUnacceptable routes
12
MT 23512 Network Flow Problems - Transportation Building Brick Company (BBC) manufactures bricks. One of BBC’s main concerns is transportation costs which are a very significant percentage of total costs. BBC has orders for 80 tons of bricks at three suburban locations as follows: NNorthwood – 25 tons WWestwood – 45 tons EEastwood – 10 tons BBC has two plants, each of which can produce 50 tons per week. BBC would like to minimize transportation costs. How should end of week shipments be made to fill the above orders given the following delivery cost per ton? Suppose demand at Eastwood grows to 50 tons. $/tonNorthwoodWestwoodEastwood Plant 1243040 Plan 2304042
13
MT 23513 Network Representation - BBC 1 Northwood 2 Westwood 3 Eastwood 1 Plant 1 2 Plant 2 50 25 45 10 Plants (Origin Nodes) DestinationsTransportation Cost per Unit Distribution Routes - arcsDemandSupply $24 $30 $40 $30 $40 $42 50
14
MT 23514 General Form - BBC Min 24x 11 +30x 12 +40x 13 +30x 21 +40x 22 +42x 23 s.t. x 11 +x 12 +x 13 <= 50 x 21 +x 22 + x 23 <= 50 x 11 + x 21 = 25 x 12 + x 22 = 45 x 13 + x 23 = 10 x ij >= 0 for i = 1, 2 and j = 1, 2, 3 Plant 1 Supply Plant 2 Supply North Demand West Demand East Demand Min 24x 11 +30x 12 +40x 13 +30x 21 +40x 22 +42x 23 s.t. x 11 +x 12 +x 13 = 50 x 21 +x 22 + x 23 = 50 x 11 + x 21 <= 25 x 12 + x 22 <= 45 x 13 + x 23 <= 50 x ij >= 0 for i = 1, 2 and j = 1, 2, 3
15
MT 23515
16
MT 23516
17
MT 23517
18
MT 23518
19
MT 23519 Network Flow Problems Transportation Problem Variations TTotal supply not equal to total demand Total supply greater than or equal to total demand Total supply less than or equal to total demand MM aximization/ minimization C hange from max to min or vice versa RRoute capacities or route minimums UUnacceptable routes
20
MT 23520 Network Flow Problems - Transportation Building Brick Company (BBC) manufactures bricks. BBC has orders for 80 tons of bricks at three suburban locations as follows: NNorthwood – 25 tons WWestwood – 45 tons EEastwood – 10 tons BBC has two plants, each of which can produce 50 tons per week. BBC would like to maximize profit. How should end of week shipments be made to fill the above orders given the following profit per ton? $/tonNorthwoodWestwoodEastwood Plant 1243040 Plan 2304042
21
MT 23521 Network Representation - BBC 1 Northwood 2 Westwood 3 Eastwood 1 Plant 1 2 Plant 2 50 25 45 10 Plants (Origin Nodes) DestinationsTransportation Cost per Unit Distribution Routes - arcsDemandSupply $24 $30 $40 $30 $40 $42 Profit per Unit
22
MT 23522 General Form - BBC Min 24x 11 +30x 12 +40x 13 +30x 21 +40x 22 +42x 23 s.t. x 11 +x 12 +x 13 <= 50 x 21 +x 22 + x 23 <= 50 x 11 + x 21 = 25 x 12 + x 22 = 45 x 13 + x 23 = 10 x ij >= 0 for i = 1, 2 and j = 1, 2, 3 Plant 1 Supply Plant 2 Supply North Demand West Demand East Demand Max
23
MT 23523
24
MT 23524
25
MT 23525
26
MT 23526
27
MT 23527 Network Flow Problems Transportation Problem Variations TTotal supply not equal to total demand Total supply greater than or equal to total demand Total supply less than or equal to total demand MMaximization/ minimization Change from max to min or vice versa RRoute capacities or route minimums UUnacceptable routes
28
MT 23528 Network Flow Problems - Transportation Building Brick Company (BBC) manufactures bricks. One of BBC’s main concerns is transportation costs which are a very significant percentage of total costs. BBC has orders for 80 tons of bricks at three suburban locations as follows: NNorthwood – 25 tons WWestwood – 45 tons EEastwood – 10 tons BBC has two plants, each of which can produce 50 tons per week. BBC would like to minimize transportation costs. How should end of week shipments be made to fill the above orders given the following delivery cost per ton? BBC has just been instructed to deliver at most 5 tons of bricks to Eastwood from Plant 2. $/tonNorthwoodWestwoodEastwood Plant 1243040 Plan 2304042
29
MT 23529 Network Representation - BBC 1 Northwood 2 Westwood 3 Eastwood 1 Plant 1 2 Plant 2 50 25 45 10 Plants (Origin Nodes) DestinationsTransportation Cost per Unit Distribution Routes - arcsDemandSupply $24 $30 $40 $30 $40 $42 At most 5 tons Delivered from Plant 2
30
MT 23530 General Form - BBC Min 24x 11 +30x 12 +40x 13 +30x 21 +40x 22 +42x 23 s.t. x 11 +x 12 +x 13 <= 50 x 21 +x 22 + x 23 <= 50 x 11 + x 21 = 30 x 12 + x 22 = 45 x 13 + x 23 = 10 x 23 <= 5 x ij >= 0 for i = 1, 2 and j = 1, 2, 3 Plant 1 Supply Plant 2 Supply North Demand West Demand East Demand Route Max
31
MT 23531
32
MT 23532
33
MT 23533
34
MT 23534
35
MT 23535 Network Flow Problems Transportation Problem Variations TTotal supply not equal to total demand Total supply greater than or equal to total demand Total supply less than or equal to total demand MMaximization/ minimization Change from max to min or vice versa RRoute capacities or route minimums UUnacceptable routes
36
MT 23536 Network Flow Problems - Transportation Building Brick Company (BBC) manufactures bricks. One of BBC’s main concerns is transportation costs which are a very significant percentage of total costs. BBC has orders for 80 tons of bricks at three suburban locations as follows: NNorthwood – 25 tons WWestwood – 45 tons EEastwood – 10 tons BBC has two plants, each of which can produce 50 tons per week. BBC would like to minimize transportation costs. How should end of week shipments be made to fill the above orders given the following delivery cost per ton? BBC has just learned the route from Plant 2 to Eastwood is no longer acceptable. $/tonNorthwoodWestwoodEastwood Plant 1243040 Plan 2304042
37
MT 23537 Network Representation - BBC 1 Northwood 2 Westwood 3 Eastwood 1 Plant 1 2 Plant 2 50 25 45 10 Plants (Origin Nodes) DestinationsTransportation Cost per Unit Distribution Routes - arcsDemandSupply $24 $30 $40 $30 $40 $42 Route no longer acceptable
38
MT 23538 General Form - BBC Min 24x 11 +30x 12 +40x 13 +30x 21 +40x 22 +42x 23 s.t. x 11 +x 12 +x 13 <= 50 x 21 +x 22 + x 23 <= 50 x 11 + x 21 = 30 x 12 + x 22 = 45 x 13 + x 23 = 10 x ij >= 0 for i = 1, 2 and j = 1, 2, 3 Plant 1 Supply Plant 2 Supply North Demand West Demand East Demand x 13 = 10 24x 11 +30x 12 +40x 13 +30x 21 +40x 22 x 21 +x 22 <= 50
39
MT 23539
40
MT 23540
41
MT 23541
42
MT 23542
43
MT 23543 Network Flow Problems Transportation Assignment Transshipment Production and Inventory
44
MT 23544 Network Flow Problems - Assignment ABC Inc. General Contractor pays their subcontractors a fixed fee plus mileage for work performed. On a given day the contractor is faced with three electrical jobs associated with various projects. Given below are the distances between the subcontractors and the projects. HHow should the contractors be assigned to minimize total distance (and total cost)? Project SubcontractorsABC Westside503616 Federated283018 Goliath353220 Universal25 14
45
MT 23545 Network Representation - ABC 1A1A 2B2B 3C3C 1 West 2 Fed 1 1 1 1 1 Contractors (Origin Nodes) Electrical Jobs (Destination Nodes) Transportation Distance Possible Assignments - arcs DemandSupply 50 36 16 28 30 18 3 Goliath 4 Univ. 1 1 35 32 20 25 14
46
MT 23546 Define Variables - ABC Let: x ij = 1 if contractor i is assigned to Project j and equals zero if not assigned
47
MT 23547 General Form - ABC Min 50x 11 +36x 12 +16x 13 +28x 21 +30x 22 +18x 23 +35x 31 +32x 32 +20x 33 +25x 41 +25x 42 +14x 43 s.t. x 11 +x 12 +x 13 <=1 x 21 +x 22 +x 23 <=1 x 31 +x 32 +x 33 <=1 x 41 +x 42 +x 43 <=1 x 11 +x 21 +x 31 +x 41 =1 x 12 +x 22 +x 32 +x 42 =1 x 13 +x 23 +x 33 +x 43 =1 x ij >= 0 for i = 1, 2, 3, 4 and j = 1, 2, 3
48
MT 23548 Network Flow Problems Assignment Problem Variations TTotal number of agents (supply) not equal to total number of tasks (demand) Total supply greater than or equal to total demand Total supply less than or equal to total demand MMaximization/ minimization Change from max to min or vice versa UUnacceptable assignments
49
MT 23549
50
MT 23550
51
MT 23551
52
MT 23552
53
MT 23553 Network Flow Problems Transportation Assignment Transshipment Production and Inventory
54
MT 23554 Network Flow Problems - Transshipment Thomas Industries and Washburn Corporation supply three firms (Zrox, Hewes, Rockwright) with customized shelving for its offices. Thomas and Washburn both order shelving from the same two manufacturers, Arnold Manufacturers and Supershelf, Inc. Currently weekly demands by the users are: 550 for Zrox, 660 for Hewes, 440 for Rockwright. Both Arnold and Supershelf can supply at most 75 units to its customers. Because of long standing contracts based on past orders, unit shipping costs from the manufacturers to the suppliers are: ThomasWashburn Arnold58 Supershelf74 The costs (per unit) to ship the shelving from the suppliers to the final destinations are: ZroxHewesRockwright Thomas158 Washburn344 Formulate a linear programming model which will minimize total shipping costs for all parties.
55
MT 23555 Network Representation - Transshipment 5 Zrox 6 Hewes 7 Rockwright 3 Thomas 4 Washburn 75 50 60 40 Warehouses (Transshipment Nodes) Retail Outlets (Destinations Nodes) Transportation Cost per Unit Distribution Routes - arcsDemandSupply $1 $5 $8 $3 $4 Transportation Cost per Unit 1 Arnold 2 Super S. $5 $8 $7 $4 Plants (Origin Nodes) Flow In 150 Flow Out 150 Resembles Transportation Problem
56
MT 23556 Define Variables - Transshipment Let: x ij = # of units shipped from node i to node j
57
MT 23557 General Form - Transshipment Min 5x 13 +8x 14 +7x 23 +4x 24 +1x 35 +5x 36 +8x 37 +3x 45 +4x 46 +4x 47 s.t. x 13 +x 14 <= 75 x 23 +x 24 <= 75 x 35 +x 36 +x 37 = x 13 +x 23 x 45 +x 46 +x 47 = x 14 +x 24 +x 35 +x 45 = 50 +x 36 +x 46 = 60 +x 37 +x 47 = 40 x ij >= 0 for all i and j Flow In 150 Flow Out 150
58
MT 23558 Network Flow Problems Transshipment Problem Variations TTotal supply not equal to total demand Total supply greater than or equal to total demand Total supply less than or equal to total demand MMaximization/ minimization Change from max to min or vice versa RRoute capacities or route minimums UUnacceptable routes
59
MT 23559
60
MT 23560
61
MT 23561
62
MT 23562
63
MT 23563 Network Flow Problems Transportation Assignment Transshipment Production and Inventory
64
MT 23564 Network Flow Problems – Production & Inventory A producer of building bricks has firm orders for the next four weeks. Because of the changing cost of fuel oil which is used to fire the brick kilns, the cost of producing bricks varies week to week and the maximum capacity varies each week due to varying demand for other products. They can carry inventory from week to week at the cost of $0.03 per brick (for handling and storage). There are no finished bricks on hand in Week 1 and no finished inventory is required in Week 4. The goal is to meet demand at minimum total cost. AAssume delivery requirements are for the end of the week, and assume carrying cost is for the end-of-the-week inventory. (Units in thousands)Week 1Week 2Week 3Week 4 Delivery Requirements58365270 Production Capacity60626466 Unit Production Cost ($/unit)$28$27$26$29
65
MT 23565 Network Representation – Production and Inventory 1 Week 1 62 Production NodesDemand NodesProduction Costs Production - arcs Demand Production Capacity 2 Week 2 3 Week 3 4 Week 4 64 66 60 5 Week 1 6 Week 2 7 Week 3 8 Week 4 36 52 70 58 $28 $27 $26 $29 $0.03 Inventory Costs
66
MT 23566 Define Variables - Inventory Let: x ij = # of units flowing from node i to node j
67
MT 23567 General Form - Production and Inventory Min 28x 15 +27x 26 +26x 37 +29x 48 +.03x 56 +.03x 67 +.03x 78 s.t. x 15 <= 60 x 26 <= 62 x 37 <= 64 x 48 <= 66 x 15 = 58+x 56 x 26 +x 56 = 36+x 67 x 37 +x 67 = 52+x 78 x 48 +x 78 = 70 x ij >= 0 for all i and j
68
MT 23568
69
MT 23569
70
MT 23570
71
MT 23571