Download presentation
Presentation is loading. Please wait.
1
E166 Collaboration J.C. Sheppard SLAC, October, 2003 E166 Collaboration Meeting SLAC, October 24-26, 2003 J. C. Sheppard
2
J.C. Sheppard SLAC October, 2003 E166 Collaboration Meeting Where Friday: Fuji Room, Bldg. 214 Saturday-Monday: ROB Redwood Room, Bldg 48 Who Naomi Nagahashi: Admin, Bldg 214 Nick Arias: Computers, Bldg 214 Vinod Bharadwaj: Talks, Schedule, Complaints
3
J.C. Sheppard SLAC October, 2003 E166 Collaboration Meeting Redwood Room, ROB Fuji Room, B214 SLAC Hotel
4
J.C. Sheppard SLAC October, 2003 E166 Collaboration Meeting What Friday-Saturday Noon: E166 Background Test Saturday PM-Sunday Noon: E166 Polarized Positron Production Test Then Sunday PM-Monday PM: POWER Meeting (see Gudi Moortgat-Pick)
5
J.C. Sheppard SLAC October, 2003 E166 Collaboration Meeting E166 Collaboration Meeting DRAFT Agenda Friday, Oct 24BACKGROUND TEST : FUJI ROOM, Building 214 9:00 AM0:15WelcomeJohn Sheppard 9:15 AM0:30T467 - Background Test & Beam ResultsAchim Weidemann 9:45 AM0:30Beam tuning strategiesFranz-Josef Decker 10:15 AM0:15Simulations 10:30 AM Overview - what do we wantJohn Sheppard 10:30 AM0:15>>>COFFEE BREAK<<< 10:45 AM0:25 Background simulation for E166Yuri Batygin 11:10 AM0:25 Csl shieldingGary Bower 11:35 AM0:25 Results from FLUKAVinod Bharadwaj 12:00 PM2:00>>>LUNCH<<< 2:00 PM Status of Apparatus 2:00 PM0:30 SiliconBill Bugg 2:30 PM0:30 CsIAchim Stahl 3:00 PM0:30 BeampipeDieter Walz 3:30 PM0:30>>>COFFEE BREAK<<< 4:00 PM0:20 AerogelKirk McDonald 4:20 PM0:20 ShieldingDieter Walz 4:40 PM0:20 Magnets/Beamline EquipJohn Sheppard 5:00 PM >>> END OF DAY <<<
6
J.C. Sheppard SLAC October, 2003 E166 Collaboration Meeting E166 Collaboration Meeting, Saturday PM
7
J.C. Sheppard SLAC October, 2003 E166 Collaboration Meeting E166 Collaboration Meeting, Sunday, AM
8
J.C. Sheppard SLAC October, 2003 E166 Collaboration Meeting E-166 Activities EPAC/SLAC Approval in June, 2003 Formation of Background Test Review Committee, June 2003 Mini-Workshop on E166 Backgrounds: July, 2003 E166 Collaboration Meeting: October, 2003 Background Test Review: October 31, 2003 SLAC Tech. Div. Schedule Discussion: Week of November 3, 2003 EPAC Status Report: November 14-15, 2003
9
J.C. Sheppard SLAC October, 2003 E166 Collaboration Meeting E-166 Activities, cont’d T467: Detector and DAQ Development in FFTB: since April, 2003 Installation of Background Test equipment: February, 2004 Background Tests: February-July, 2004, tbd E166 Polarized Positron Production: January, 2005
10
J.C. Sheppard SLAC October, 2003 E166 Collaboration Meeting E166 Background Test T467: Background Test and Beam Results: Achim Weidemann Beam Tuning Strategies: Franz-Josef Decker Simulations: Overview-what do we want: John Sheppard Background simulation for E166: Yuri Batygin CsI Shielding:Gary Bower Results from FLUKA:Vinod Bharadwaj
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.