Team HazardHawk Team HazardHawk 2008
2
The HazardHawk Team HazardHawk 2008
3
Last Week Complete Trade Studies Individual trade studies were completed and submitted. Start CNC/Machining/Prototyping CNC machine was not operable Bits and mounts will be available this week Team HazardHawk 2008
4
Last Week Obtaining Electronic Components Components will be bought from Mr. Brownell when available
5
Concept Status Layout (0,0) is in center of circle (0,0) for all other pieces is the bottom left-hand corner Z-axis is out of the page
6
Concept Status 1/2” between all pieces 1/8” end mill used to machine Thanks to Edytka Christner and Jude Miller Feed rate End mill speed Acquiring bits and mounts Team HazardHawk 2008
7
Action Items CNC Body Mounts/Braces Turret Complete Prototype Performance Requirements Meeting will be held on 3/16/08 Document will be turned in on 3/18/08 Finalize CAD of Arm Mechanism Team HazardHawk 2008