3 Last Week  Complete Trade Studies Individual trade studies were completed and submitted.  Start CNC/Machining/Prototyping CNC machine was not operable Bits and mounts will be available this week Team HazardHawk 2008

4 Last Week  Obtaining Electronic Components Components will be bought from Mr. Brownell when available

5 Concept Status  Layout (0,0) is in center of circle (0,0) for all other pieces is the bottom left-hand corner Z-axis is out of the page

6 Concept Status  1/2” between all pieces  1/8” end mill used to machine  Thanks to Edytka Christner and Jude Miller Feed rate End mill speed Acquiring bits and mounts Team HazardHawk 2008

7 Action Items  CNC Body Mounts/Braces Turret  Complete Prototype Performance Requirements Meeting will be held on 3/16/08 Document will be turned in on 3/18/08  Finalize CAD of Arm Mechanism Team HazardHawk 2008